1. Site visit documents must be submitted with the bidding documents. 2. The fitting parts of the machinery/chatal boiler must comply with the existing machinery/chatal boiler drawing.
3.Samples must be provided before tender closing date.
4.Without the above mentioned criteria the bidder will be disqualified.
Procurement of R&D Raw Materials and Spares for PP&PDC