1. All tenderer must registered in e-GP and fulfilled the criteria in respect of legal, technical & financial are describe in the TDS (Tender Data Sheet) of tender document.
2. A satisfactory completion of similar types of works at least Tk 10.00 Lac under a single of contract(s) over a period of 05(Five) years shall be required. Years counting backward from the date of publication of IFT in the newspaper.
3. In addition to ITT Clause no 17, if any tenderer submit rate (Grand Total) which is 10% lower than the estimatted cost than he/she must be submit rate analysis of all items. Otherwise his/her tender will be considered as nonresponsive.
4.The required average annual construction turnover shall be greater than Tk15.00 Lac over the last 05(Five) years.Years counting backward from the date of publication of IFT in the newspaper. Necessary supporting documents shall be submitted with the tender.
5.The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 15.00 Lac between which should be supported by necessary certificate issued 10-02-15 to 02-03-15.Necessary document of bank statement/ savings certificate/ line of credit facilities showing the amount shall be submitted along with the tender by the tenderer.
6.Evaluation Criteria:
a) During evaluation instructions of Ministry of Road Transport and Bridges will be followed which states if a tenderer quote rate more than 15% of estimated cost then his tender will be considered as non-responsive .
b) In analysis the rate of the major item bitumen should compliance with current market rate otherwise his tender also considered as non-responsive.
|