1.As described in Tender Document.
2.The minimun number of years of general exprience of the tender in the construction work as prime contractor os subcontractor or management contractor shall be five (05) years counting backward from the date of publication of IFT in the newspapers.
3. The minimun number of years of general exprience of the tender in the construction work as prime contractor os subcontractor or management contractor in construction works of at least 01 (one) contract of similar nature, complexity and methods/ construction tecnology successfully completed within the last 05 (Five) years, with a value of least BDT- 244.oo lac.
4. The requiredverage annual construction trunover shall be greater than BDT- 260.00 lac over the last 05 (Five) years.
5. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be BDT-82.00 lac. In case of liquied assets, statement (Print) of bank accounts of the bidder issued within 01 month before bid submission deadline, in case of working capital, the last year audited balance sheet of the bidder, in case of credit facilities, the certicate issued by the bank referencing to this package number should be considered for evaluation.
(a). Construction of BC Road at Dhunat road Doctor Clinic to Hazipur Highway road vai Sherpur Thana (Ch. 0.00-2600m) under Sherpur Pourashava. Total length = 2600m (b). Construction of BC Road start from College road to near house of Hamed via near house of Razu Profficer (Ch. 0.00-370m & Link 130.0) In Ward no. 06 under Sherpur Pourashava. Total length = 500m (c). Construction of RCC drain start from National Highway (Alamgir shop) to near Sarkar shop via Poura shishu park under Sherpur Pourashava (ch.0.00-760m) Total length=760m (d). Construction of BC Road start from National Highway (Alamgir shop) to near house of Dinu Babu in Ward no-05 under Sherpur Pourashava (ch.0.00-90.0m) Total length=90m (e). Construction of BC Road start from (National Highway Dhaka-Bogra) to Near Dalal office in Ward no-07 (ch.0.00-320.0m) under Sherpur Pourashava Total length=320m.
Cost of recovered (Salvage) materials (1st Class Brick,etc.) Fixed Amount in TK-553408.00
Note: Above recovered materials cost will be deducted from the payments of the Contractor and in any case recovered material cost will not be changed.