View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Tenderer can not give consent by selecting "I AGREE" Comboo box as Fixed rate items b(i) was not duly fillup. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 15/07/2018 16:00 | 22/07/2018 16:00 |
| Eligibility of Consultant | As Stated in TDS 01.Minimum five years of general experience. 02.Minimum Average annual construction turnover shall be greater than BDT.440,00,000.00 over the last five years. 03.Minimum specific experience within the last five years is at least BDT. 415,00,000.00 04.Minimum liquid assets is BDT.140,00,000.00 N.B:The cost of recover materials (salvage) is Tk.33130.00( Thirty Three Thousand One Hundred Thirty only) which will be deducted from the payment of the contractor & in any case recover materials cost will not be changed. |
As Stated in TDS 01.Minimum five years of general experience. 02.Minimum Average annual construction turnover shall be greater than BDT.440,00,000.00 over the last five years. 03.Minimum specific experience within the last five years is at least BDT. 415,00,000.00 04.Minimum liquid assets is BDT.140,00,000.00 N.B:The cost of recover materials (salvage) is Tk.33130.00( Thirty Three Thousand One Hundred Thirty only) which will be deducted from the payment of the contractor & in any case recover materials cost will not be changed. |
| Opening Date & Time | 16/07/2018 12:30 | 23/07/2018 12:30 |
| Last date & time for Tender/Proposal Security Submission | 16/07/2018 12:00 | 23/07/2018 12:00 |
| Closing Date & Time | 16/07/2018 12:30 | 23/07/2018 12:30 |
| Brief Description of Goods,Works or Service | a. (i) Construction of RCC Box Culvert on Palong School to Premtala road at Ch.0+200m. a. (ii) Construction of RCC Box Culvert on Palong School to Premtala road at Ch 0+300m. a. (iii) Construction of RCC Box Culvert on Bus stand to Kurashi Balakhana road at Ch 0+700m. a. (iv) Construction of RCC Box Culvert on Bus stand to Kurashi Balakhana road at Ch 1+250m. a. (v) Construction of RCC Box Culvert on Chowrongi to Shornogosh Dighir Par road at Ch 0+400m. a. (vi) Construction of RCC Box Culvert on Chowrongi to Shornogosh Dighir Par road at Ch 1+500m. b. (i) Construction of 21.00m RCC Bridge at Charpalong Road. b. (ii) Construction of 21.00m Bridge Approach Road at Charpalong road. b. (iii) Street light for 21m R.C.C Bridge at Charpalong Road. c) Construction of 5 Vent 3.6mx4m RCC Box Culvert at PTI complex connecting road at Shariatpur Pourashava,Shariatpur. d) Construction of 5 Vent 4mx3.6m RCC Box Culvert at Brikhatala,Shariatpur Pourashava, Shariatpur. e) Construction of 2 Vent 3.6mx4m RCC Box Culvert at Angaria Bazar to Rajgonj Bazar Road at Ch. 2250m, under Shariatpur Pourashava, Shariatpur. |
a. (i) Construction of RCC Box Culvert on Palong School to Premtala road at Ch.0+200m. a. (ii) Construction of RCC Box Culvert on Palong School to Premtala road at Ch 0+300m. a. (iii) Construction of RCC Box Culvert on Bus stand to Kurashi Balakhana road at Ch 0+700m. a. (iv) Construction of RCC Box Culvert on Bus stand to Kurashi Balakhana road at Ch 1+250m. a. (v) Construction of RCC Box Culvert on Chowrongi to Shornogosh Dighir Par road at Ch 0+400m. a. (vi) Construction of RCC Box Culvert on Chowrongi to Shornogosh Dighir Par road at Ch 1+500m. b. (i) Construction of 21.00m RCC Bridge at Charpalong Road. b. (ii) Construction of 21.00m Bridge Approach Road at Charpalong road. b. (iii) Street light for 21m R.C.C Bridge at Charpalong Road. c) Construction of 5 Vent 3.6mx4m RCC Box Culvert at PTI complex connecting road at Shariatpur Pourashava,Shariatpur. d) Construction of 5 Vent 4mx3.6m RCC Box Culvert at Brikhatala,Shariatpur Pourashava, Shariatpur. e) Construction of 2 Vent 3.6mx4m RCC Box Culvert at Angaria Bazar to Rajgonj Bazar Road at Ch. 2250m, under Shariatpur Pourashava, Shariatpur. |