View IFT /PQ / REOI / RFP / PPS Notice Details
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
Amendment 1 |
| Field Name |
Old Value |
New Value |
| TDS/PDS--C. Qualification Criteria--
|
(a)The Tenderer shall have a minimum of 3 years of General experience in the supply of Goods and related services.
(b) The Tenderer shall have a minimum of three years of specific experience in the production and supply of similar goods and related services and shall provide Satisfactory Performance Certificates from at least 2 (two) electricity utilities within the last 5 (five) years from the date of Tender Opening.The Tenderer having this qualification have to upload the Letter of Warranty for 12 Months months from the last delivery date and or &Iissuing date with this tender.
or
The Tenderer shall have a minimum of three years of specific experience in the production and supply of similar goods and related services and shall provide Satisfactory Performance Certificates of supplying at least 17 Nos for each capacity or higher capacity of same voltage level from public or private end user within the last 3 (three) years from the date of Tender Opening and also the manufacturing plant of the tenderer shall be inspected by tender evaluation Committee to asses its production capability with regard to Technical and Financial aspect in comparison to the information and document furnished by Tenderer. Upon the satisfaction of the committee, a quality certificate shall be issued in favour of the local manufacturer. All cost regarding inspection shall be brone by the tenderer.The tenderer shall furnish the following information and documents with the tender :-
1. Location of the Factory & Layout Plan
2. List of Capital Machineries (Related tomanufacturer of the offered goods.
3. Approval of Govt.
4. Factory Project Profile
5. Production Capacity (Yearly)
6. Production Line description
7. List of Key Personnel (with Bio-Data)
8. Sample of the offered Product (To be inspected during Inspection)
9. Testing Facilities.
10. Letter of Warranty for 24 Months from the date of completion of satisfactory Post landing inspection.
11.TIN & VAT Registration
12. Source of raw materials.
N.B Those tenderers under the option of giving access to inspect their transformer manufacturing plant shall be eligible to participate in tender inviting for supply of Transformer not more than 200nos in one lot or package.
(c)
i) The minimum production capability or availability of equipment is/ are: At least 1/4th of the total tendered quantity per month.
ii) The minimum supply value of goods of the manufacturer under a single contract in the last five years is at least 25% of the total offered amount
or
The minimum supply value of goods of the manufacturer in the last five years is at least 25% of the total offered amount whose factory shall be inspected by TEC.
|
(a)The Tenderer shall have a minimum of 3 years of General experience in the supply of Goods and related services.
(b) The Tenderer shall have a minimum of three years of specific experience in the production and supply of similar goods and related services and shall provide Satisfactory Performance Certificates from at least 2 (two) electricity utilities within the last 5 (five) years from the date of Tender Opening.The Tenderer having this qualification have to upload the Letter of Warranty for 12 Months months from the last delivery date and or &Iissuing date with this tender.
or
The Tenderer shall have a minimum of three years of specific experience in the production and supply of similar goods and related services and shall provide Satisfactory Performance Certificates of supplying at least 50 Nos for each capacity or higher capacity of same voltage level from public or private end user within the last 3 (three) years from the date of Tender Opening and also the manufacturing plant of the tenderer shall be inspected by tender evaluation Committee to asses its production capability with regard to Technical and Financial aspect in comparison to the information and document furnished by Tenderer. Upon the satisfaction of the committee, a quality certificate shall be issued in favour of the local manufacturer. All cost regarding inspection shall be brone by the tenderer.The tenderer shall furnish the following information and documents with the tender :-
1. Location of the Factory & Layout Plan
2. List of Capital Machineries (Related tomanufacturer of the offered goods.
3. Approval of Govt.
4. Factory Project Profile
5. Production Capacity (Yearly)
6. Production Line description
7. List of Key Personnel (with Bio-Data)
8. Sample of the offered Product (To be inspected during Inspection)
9. Testing Facilities.
10. Letter of Warranty for 24 Months from the date of completion of satisfactory Post landing inspection.
11.TIN & VAT Registration
12. Source of raw materials.
N.B Those tenderers under the option of giving access to inspect their transformer manufacturing plant shall be eligible to participate in tender inviting for supply of Transformer not more than 200nos in one lot or package.
(c)
i) The minimum production capability or availability of equipment is/ are: At least 1/4th of the total tendered quantity per month.
ii) The minimum supply value of goods of the manufacturer under a single contract in the last five years is at least 25% of the total offered amount
or
The minimum supply value of goods of the manufacturer in the last five years is at least 25% of the total offered amount whose factory shall be inspected by TEC.
|
| Amendment / Corrigendum/ Addendum No. : |
1 |
| S. No. |
File Name |
File Description |
File Size
(in KB) |
| 1 |
Amendment on pur_227.pdf |
Amendment of Tender ID 20631 |
117192 |