1.As described in Tender Document.
2.The minimun number of years of general exprience of the tender in the construction work as prime contractor os subcontractor or management contractor shall be five (05) years counting backward from the date of publication of IFT in the newspapers.
3. The minimun number of years of general exprience of the tender in the construction work as prime contractor os subcontractor or management contractor in construction works of at least 01 (one) contract of similar nature, complexity and methods/ construction tecnology successfully completed within the last 05 (Five) years, with a value of least BDT-161.31 lac
4. The requiredverage annual construction trunover shall be greater than BDT- 172.06 lac over the last 05 (Five) years.
5. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be BDT- 53.77 lac. In case of liquied assets, statement (Print) of bank accounts of the bidder issued within 01 month before bid submission deadline, in case of working capital, the last year audited balance sheet of the bidder, in case of credit facilities, the certicate issued by the bank referencing to this package number should be considered for evaluation.
(A). Construction of Drain from National Highway Nandigram Bus Stand to Darkipara moar Ch.0 to 330m under Sherpur Pourashava Bogra. (B).Development of 2 nos. Pourashava Graveyard at ward no.1 and 7 under Sherpur Pourashava Bogra. HBB road 545.4 m Boundary wall 935.37m 2 nos gates and shades (C) Supplying fitting & fixing of street lights in Graveyard at word no. 1 & 7 under Sherpur Pourashava Bogra Total Length 1015.39m
Cost of recoverd (Salvage) materials (1st Class bricks.) Fixed Amount in Tk-132932.00 Note: Above recovered materials cost will be deducted from the payment of the Contractor and in any case recovered materials cost will not be changed.