1. The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 03 (Three) years.
2. The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [state number] contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 03 (Three) years, each with a value of at least Tk.750000 (Seven lac & fifty thousand) Experience Certificate shall be submitted in a prescribed formate (Form-E attached in General specifications) years counting backward from the date of publication of IFT in the newspaper
3. The required average annual construction turnover shall be greater than Tk 1500000 (Fifteen lac) over the last 03 (Three) years.Turn Over Certificate shall be submitted in a formate which describe all relevant details /certificate of IT officer, if the tenderers want to qualify more than one package, each package shall be qualify seperately.
4. The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk. 3000000 (Three lac)
If the tenderers want to qualify more than one package, each package shall be qualified separately for Liquid asset. In the case of Liquid asset certificate and bank statement form should be submitted. In the case of credit facilities, it should be sanctioned.
5. for fixed price item tenderer must quote as per direction for each water option.
6. Other condition as per TDS
|