a. The tenderer must submit up to date authorization letter for submission against this tender ID. b. If the quoted rate of any item deviates more than five percent (5%) compared to the RHD Rate Schedule 2018, then the tenderer must enclose rate analysis following RHD standard format in support of the quoted rate of that item with the tender. c. All bituminous works under this tender should be done with bitumen of penetration grade 60/70, and defect liability period will be 36 months. d. Tenderer should mention the full name of his/her firm (No abbreviation is allowed). In case of JV, All the partners should have the experience of similar nature of work individually. e. Asphalt Batching Plant must be used in this work. Tenderer must submit relevant document in favor of ownership of his/her own asphalt batching plant. If he/she does not own asphalt batching plant, then he/she must submit the Contract Agreement for acquisition of asphalt batching plant. The tenderer must provide the authorization of delivering the asphalt batching plant in site in due time.
Note:
1. As per consent of CPTU, the Tenders shall be evaluated in the e-GP system with the help of online database system- TDMS. 2. Qualification information and evidences (such as work experience certificates, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc of the Tenderers as mapped in the e-GP Tenders must be availalble in the TDMS system so that TEC can evaluate the tenders digitally within short period of time. 3. If there is any conflicting information in TDMS and e-GP, the information provided in the e-GP system shall prevail. 4. A tenderer not having sufficient information in the TDMS system may be evaluated as ineligible 5. Evaluation Sheet generated by TDMS shall be uploaded into the e-GP system by the TEC
(a) Surfacing work with DBS-Wearing Course and Earthwork at different location of Rahmatpur-Babugonj-Muladi-Hizla Road (Z-8034) under Barisal Road Division during the year 2018-2019 (b) DBST work at Ch. 167+358 to 169+358 Km. of Dhaka (Jatrabari)-Mawa-Bhanga-Barisal-Patuakhali National Highway (N-8) under Barisal Road Division during the year 2018-2019 (c) Repair of pavement by DBST work at 170th(p) km to 174th(p) km (Ch.169+358 to Ch.173+358) of Dhaka (Jatra bari)-Mawa-Bhanga-Barisal-Patuakhali National Highway (N-8) Road (Jhalokati portion) Through PMP under Jhalokati Road Division during the year 2018-2019