The required annual construction turnover shall be greater than Tk. 70.00. lakh over the last 05 (five) years.
A satisfactory completion of similar works of at least Tk.9.50 lakh under Single of contract over a period of last 05(five) years shall be required years.
Counting backward from the date of publication of IFT in the website. The minimum amount of liquid assets, net of other contractual commitments, is Tk.10.00 lakh.
Strengthening the existing damaged pavement by Aggregate Base Type-II , Carpeting with Seal-coat work at 6th Km. (P) (Murapara Bazar) 0f Bhulta-Rupgonj-Baraith-Badda Road under Narayangonj Road Division during the year 2014-2015.