As Per TDS
SDIRIIP/HABI/VR/W-012 1.Improvement of Monohorpur UZR-Harinkhola BGB Camp Road from Ch.1460-3800m by BC b Construction of 5Nos. 0.625x0.600m U-Drain at Ch. 1502m 1660m 2482m 3133m & 3229m on the Same Road Road ID 636714002 2Improvement of Montola BDR Camp-Sahid abdul Jalil Road from Ch.1300-2500m by BC b Construction of 2Nos. 0.625x0.600m U-Drain at Ch. 1485m & 2160m on the Same Road under Madhabpur Upazila Habigan District.Road ID 636714007.