1.The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 05(five) years. i.e. years counting backward from the date of publication of IFT in the News Paper. a.The minimum specific experience as a Prime Contractor in construction works of at least one (1) number of similar contract completed during last 5 (five) years: b. Similar nature of work means completion of multi-storied building with R.C.C frame structure & Pile foundation work valued Tk.1500.00 (One Thousand five Hundred) lac in a single Contract under Public fund. This is to be supported by work order/NOA and completion certificate. The Tenderer should have ABC Electrical License. In case of JVCA any of the partners should have the ABC Electric License.
2.The required average annual Construction Turnover shall be minimum Tk. 2000.00 (Two Thousand) lac over the last 05 (Five) years i,e years counting backward from the date of publication of IFT in the e-GP website/newspaper. Average annual Construction Turnover i,e total certified payments received for contracts in progress or completed under public sector i,e Government, Semi-Government and Autonomous bodies shall only be considered. Private works shall not be taken into account.
3.The minimum amount of liquid assets i.e. working capital or credit facilities of the Tenderer shall be Tk. 450.00 (Four hundred Fifty) Lac. The liquid asset certificate issued before publication of IFT will not be considered for evaluation. Liquid asset certificate will be checked by the Procuring Entity.
4.The minimum Tender Capacity shall be: 2100.00 ( Two Thousand One Hundred ) Lac.
Upgradation, Repair & Renovation of Kotalipara Upazila Health Complex UZHC from 50 to 100 Bed in Gopalgonj District.