View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | This Corrigendum has been made due to unavoidable circumstances. Amendment of BOQ : Item No. 05/05/01, Quantity shall be, 3175.860 cum instead of 1912.500 cum |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 21/10/2018 14:00 | 25/10/2018 14:00 |
| Eligibility of Consultant | All e-GP Registered Tenders who fulfill all the requirements as stated in the Tender. a) As per consent of CPTU, the Tenders shall be evaluated in the e-GP system with the help of online database system-TDMS. |
All e-GP Registered Tenders who fulfill all the requirements as stated in the Tender.
a) As per consent of CPTU, the Tenders shall be evaluated in the e-GP system with the help of online database system-TDMS. |
| Opening Date & Time | 22/10/2018 12:00 | 28/10/2018 12:00 |
| Last date & time for Tender/Proposal Security Submission | 21/10/2018 15:00 | 25/10/2018 15:00 |
| Closing Date & Time | 22/10/2018 12:00 | 28/10/2018 12:00 |
| Brief Description of Goods,Works or Service | Construction of 66.83m(21.34 x 3) Long RCC. Girder Kaligonj Bridge at 18th Km, Construction of 28.78m (27.44 x 1) Long P.C. Girder Hotatpara East Bridge at 38th (Ch: 37+702.53) Km, Construction of 28.78m (27.44 x 1) Long P.C. Girder South Rajapur Bridge at 39th (Ch: 38+202.53) Km, Construction of 40.974m (39.634 x 1) Long P.C. Girder Hatirpul Bridge at 38th (Ch: 37+900.183) Km of Nandigram(Katham)-Kaligonj-Raninagar Road (Z-5207), in/c Protective work, Sign Signal, Km Post, Earthwork and Construction of Flexible Pavement Both Side of Bridge Approach Under Road Division, Naogaon During the year 2018-2019. |
Construction of 66.83m(21.34 x 3) Long RCC. Girder Kaligonj Bridge at 18th Km, Construction of 28.78m (27.44 x 1) Long P.C. Girder Hotatpara East Bridge at 38th (Ch: 37+702.53) Km, Construction of 28.78m (27.44 x 1) Long P.C. Girder South Rajapur Bridge at 39th (Ch: 38+202.53) Km, Construction of 40.974m (39.634 x 1) Long P.C. Girder Hatirpul Bridge at 38th (Ch: 37+900.183) Km of Nandigram(Katham)-Kaligonj-Raninagar Road (Z-5207), in/c Protective work, Sign Signal, Km Post, Earthwork and Construction of Flexible Pavement Both Side of Bridge Approach Under Road Division, Naogaon During the year 2018-2019. |