As stated in TDS
BDRIDP/BAR/GOR/CCA-St/01 Construction of 3 Nos Single Vent 4.30mx4.30m RCC Box Culvert & 2 Nos U-Drain on Battala Kapali bari Bridge (NHW) to Khanjapur High School road at Ch. 95m, 270m, 1276m, 564m & 970m. (ID No. 506324136)