All e-Gp Registered tenderer in Bangladesh & who fulfill the Qualification Criteria as below. 1) A Satisfactory Completion of Similar works (Like Building Construction/PWD Works) of at least Tk 16.00 ( Sixteen) lac under a single of contract(s) over a period of last 5 (five) years shall be required. 2) The required Average annual Construction turn Over Tk 16.00 ( Sixteen ) lac .Total=80 lac within the last 05(five) years.(Only For Work Certificate/Payment Certificate Should be Considered). 3) The minimum amount of liquid assets or working capital or credit facilities (Un -Conditional) of the Tender shall be Tk.10 (ten) lac (The supporting document should not consider if the document is issued before 15(fifteen) days from the date of opening of the tender). 4)Special Instruction of tenderer : if the quoted rate more than 10 (ten) Percent below in comparison to the update official estimate(Consider Schedule of Rate-2011) the tender must be submitte with tender the detail analysis of quoted rate of each item (as per Office order the Ministry of Road Transport & Bridges , vide memo No.35.00.0000.015.07.003.15-22 Date 08.01.2015).otherwise tender will be rejected. Ã?Â
Renovation Work of Workshed for RHD Staff Quarter of Block-3 at telipara under Gazipur Road Division During The Year 2014-15(Shed No.6(Six),7(Seven),8(Eight),9(Nine),10(Ten)&11(Eleven).