View IFT /PQ / REOI / RFP / PPS Notice Details ( Meeting Doc. Available. )
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | An amendment has been issued due unavoidable circumstance in the TDS |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. Tenderer should submit all experience certificates in PPR Format. 2. In case of turnover all respective experience should be submitted by the tenderer in PPR Format. 3. Others terms and conditions should be applicable as per STD. |
1. Tenderer should submit all experience certificates in PPR Format. 2. In case of turnover all respective experience should be submitted by the tenderer in PPR Format. 3. Others terms and conditions should be applicable as per STD. |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 300.00lac over the last 5 years.
[ years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 50.00lac
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractorâ??s monthly certificate, allowing time to prepare an invoice, for the Project Managerâ??s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual construction turnover shall be greater than Tk 300.00lac over the last 5 years.
[ years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 75.00lac
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
| Brief Description of Goods,Works or Service | Installation of 6 Six nos Reverse Osmosis Plant 2000 LPH at Ikri union under Safe Drinking Water Supply Project at different unions of Bhandaria Upazila in Pirojpur. |
Installation of 6 Six nos Reverse Osmosis Plant 2000 LPH at Ikri union under Safe Drinking Water Supply Project at different unions of Bhandaria Upazila in Pirojpur. |