As Describe in TDS
a. Construction of RCC drain from Okhara Main road Ninekhine road side Ward No-01 Under Pariya Pourashava CTG. Ch 0+000 to 0+450m b. Construction of RCC drain from Munsef Bazar to Six Storied Barua Building Kali Bari Road Ward No-02 under Pariya Pourashava CTG. Ch 0+000 to 0+115m c. Construction of RCC drain at Sonamia Sow. Bari West side to Buckkhali Canal Ward No-04 under Patiya Pourashava CTG Ch 0+000 to 0+250m d. Construction of RCC drain including footpath from Club road to Rail Station Ward No-09 Under Patiya Pourashava CTG. Ch 0+000 to 0+230m. e. Rehabilitation of Road Munsef Bazar to Six Storied Barua Building Kali bari Road Ward No-02 under Patiya Pourashava CTG.Ch 0+000 to 0+115m