| TDS/PDS--B. e-Tender Document (e-TD)--
|
Pre- Tender meeting Date & Time -
i) Start Date & Time: 01-Nov-2018 18:00 (PM) BST
ii) Closing Date & Time: 08-Nov-2018 17:00 (PM) BST
|
Pre- Tender meeting Date & Time -
i) Start Date & Time: 08-Nov-2018 09:00 (AM) BST
ii) Closing Date & Time: 14-Nov-2018 17:00 (PM) BST
|
| TDS/PDS--E. Tender e-Submission--
|
The deadline for the submission of e-Tender security is:
Time & Date: up to 14.00 PM, Date : 14-November-2018
The deadline /closing date for the lodgement e-Tenders is:
Time & Date: up to 15.00 PM, Date : 14-November-2018
ITT 46.1
Include the following text after the TDS:
During the evaluation of Tenders, the following definitions apply:
(a) â??Deviationâ?� is a departure from the requirements specified in the Tender Document;
(b) â??Reservationâ?� is the setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Tender Document; and
(c) â??Omissionâ?� is the failure to submit part or all of the information or documentation required in the Tender Document.
ITT 50.2
Add the following text at the end of ITT 50.2:
â??ITT 50.2 If such extreme cases arises, ADB prior approval shall be required before moving to next step.
ITT 51.2
Add the following text at the end of ITT 51.2:
â??ITT 51.2 If such situation arises, ADB prior approval shall be required before proceeding with negotiationsâ?�.
ITT 54.2
Text in ITT 54.2 shall be replaced with the following text:
Reject all Tenders following recommendations from the Evaluation Committee only after approval of such recommendations by the Head of PE and concurrence from Asian Development Bankâ?�
|
The deadline for the submission of e-Tender security is:
Time & Date: up to 14.00 PM, Date : 26-November-2018
The deadline /closing date for the lodgement e-Tenders is:
Time & Date: up to 15.00 PM, Date : 26-November-2018
ITT 46.1
Include the following text after the TDS:
During the evaluation of Tenders, the following definitions apply:
(a) “Deviation” is a departure from the requirements specified in the Tender Document;
(b) “Reservation” is the setting of limiting conditions or withholding from complete acceptance of the requirements specified in the Tender Document; and
(c) “Omission” is the failure to submit part or all of the information or documentation required in the Tender Document.
ITT 50.2
Add the following text at the end of ITT 50.2:
“ITT 50.2 If such extreme cases arises, ADB prior approval shall be required before moving to next step.
ITT 51.2
Add the following text at the end of ITT 51.2:
“ITT 51.2 If such situation arises, ADB prior approval shall be required before proceeding with negotiations”.
ITT 54.2
Text in ITT 54.2 shall be replaced with the following text:
Reject all Tenders following recommendations from the Evaluation Committee only after approval of such recommendations by the Head of PE and concurrence from Asian Development Bank”
|