a) A satisfactory completion of similar works of at least Tk 15.00 lakh under one (01) no. of contract over a period of five (05) years shall be required.
b) The required average annual construction turnover shall be greater than Tk 20.00 lakh over the best two (02) years in the last five (5) years.
c) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 12.00 lakh.
d) The minimum Tender capacity shall be: Tk. 22.00 lakh.
Renovation works including providing Thai Aluminium of 06 Six units of A.O. Flat (Old Port Commissioner Building) at Sadarghat.