View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Opening date to be Change . |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 06/12/2018 10:15 | 10/12/2018 10:15 |
| Opening Date & Time | 06/12/2018 11:50 | 10/12/2018 11:50 |
| Last date & time for Tender/Proposal Security Submission | 06/12/2018 10:30 | 10/12/2018 10:30 |
| Closing Date & Time | 06/12/2018 11:50 | 10/12/2018 11:50 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Add new Condition. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. Upto date Firm Registration Certificate/Trade License. 6. Annual Construction turn over is Tk.450.00 lakh for last 5 (Five) years. 7. The Tenderer who have not completed the previous works in due time (Schedule Time) is requested to not perticipat/ attened in this tender. (Vide momo no.-03.074.039.16.00.004.2018.377; DT-30.08.2018). If any one flactuate/violate this order, the tenderer will be summarily rejected without assigning any reason. 8. Rate quoted by the Tenderer if found more than 10% (Ten percent) less or above, than the Estimated cost, the tender will be summarily rejected without assigning any reason. PPA-2006, PPR-2008 & PPR (Amendment) 2016 shall be the part and parcel of the contract. |
1. Upto date Firm Registration Certificate/Trade License. 6. Annual Construction turn over is Tk.450.00 lakh for last 5 (Five) years.(For Each lot in same App) 7. The Tenderer who have not completed the previous works in due time (Schedule Time) is requested to not perticipat/ attened in this tender. (Vide momo no.-03.074.039.16.00.004.2018.377; DT-30.08.2018). If any one flactuate/violate this order, the tenderer will be summarily rejected without assigning any reason.
8. Rate quoted by the Tenderer if found more than 10% (Ten percent) less or above, than the Estimated cost, the tender will be summarily rejected without assigning any reason. PPA-2006, PPR-2008 & PPR (Amendment) 2016 shall be the part and parcel of the contract. |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk 450.00 Lakh over the last Five (05) years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities(e-PW3-7) of the Tenderer shall be Tk 65.00 Lakh
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractorâ??s monthly certificate, allowing time to prepare an invoice, for the Project Managerâ??s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual construction turnover shall be greater than Tk 450.00 Lakh over the last Five (05) years.(For Each lot in same App)
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities(e-PW3-7) of the Tenderer shall be Tk 65.00 Lakh(For Each lot in same App)
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
| Brief Description of Goods,Works or Service | CONSTRUCTION OF 6-STORIED ACADEMIC BUILDING WITH 6-STORIED FOUNDATION IN/C. SANITARY WATER SUPPLY & INTERNAL ELECTRIFICATION WORKS AT MISON GIRLS HIGH SCHOOL RAJPARA .RAJSHAHI . |
CONSTRUCTION OF 6-STORIED ACADEMIC BUILDING WITH 6-STORIED FOUNDATION IN/C. SANITARY WATER SUPPLY & INTERNAL ELECTRIFICATION WORKS AT MISON GIRLS HIGH SCHOOL RAJPARA .RAJSHAHI . |