1. Tenderer must be registered in e-GP system through CPTU, IMED. 2. A satisfactory completion of similar works of at least BDT 1050000 (Ten Lac and Fifty thousand) only in a single contract over a period of last 03 (three) years shall be required. The following work will be treated as similar nature of work: Earthwork in canal. 3. The required average annual construction turnover shall be greater than BDT 1800000/- (Taka Eighteen Lac) only over the period of last 03 (three) years. 4. The minimum amount of liquid asset of working capital or credit facility of the tenderer shall be BDT 1100000/- (Taka Eleven Lac) only. In case of credit certificate from the bank, specific package number and name of work must be mentioned in the certificate and also have to be issued within 14 (fourteen) days before the deadline of submission of the tender. In case of Line of Credit CPTU prescribed form must be followed. 5. Pay order from any scheduled bank of Dhaka city or demand draft from any scheduled bank of Bangladesh in favour of Deputy Director, Dhaka Regional Accounting Center, BWDB, Dhaka will be allowed. 6. Work order will be issued after getting approval of NDR budget re-appropriation of FY 2014-15 by competent authority
Removal of garbage, spoil earth, vegetates and other obstacles from Main Drainage canal-1 (MDC-1) from km. 7.75 to km. 9.25, from DL-1/L-1 khal from Km. 0.00 to km.1.00 and from SD-6 khal from Km. 0.00 to km.2.50 of DND Irrigation Project during 2014-15 under Dhaka O&M Division-1