A satisfactorily completion of civil works of at least TK. 5,00,000.00 (Five Lac ) each only under 01 (one) number of contract(s) over a period of 03 (thee) years shall be required. The required average annual construction turnover shall be greater than TK. 10,00,000.00 (Ten lac) only over the last 03 (three) years
The minimum amount of liquid assets or working capital or credit facilities of the tenderer shall be TK. 8,00,000.00 (Eight lac) only The minimum capital shall be 5,00,000.00 (Five lac) only
Construction related works as Carpeting work,CC work, RCC etc.