As required
RDRIDP/Bogura/Kahaloo- 3/18-19 a Improvement of Murail UP-Kalitola Hat Raod via paikor Bonbonai Road from Ch.00-638m & 870-2710m Rd ID-110543006 Including salvageTK.665537.00. Construction of 04 nos U-Drain Size 0.625x7.00m at ch.6m 238m1904m & 2564m. Construction of 04 nos U-Drain Size 0.375x5.00m at ch.2174m 2207m2232m & 2260m.Construction of Surface drain Length184mbImprovement of Kazipara R&H-Shehali GC via Kurnipara Noldobi Road from Ch.4125-5550m Rd ID-110542012.Construction of 01 nos U-Drain at ch.4305m. Construction of 03 nos U-Drain Size 0.375x0.450X6.00m at ch.4374m 4430m & 4526m. Construction of 02 nos U-Drain Size 0.625x0.600x7.00m at ch.4330m & 4599m.Construction of Surface drain Length630mcImprovement of Narhatto High School-Darghahat madrasa via Darghahat Mazar Road from Ch.00-692m Rd ID-110545035 Including salvage TK. 335937.00.Construction of 04 nos U-Drain Size 0.375x5.00m at ch.2m 50m91m & 116m.Construction of 02 nos U-Drain Size 0.625x6.00m at ch.210m & 635m.Construction of 1.30X1.30 RCC Box Culvert at ch.288m.Construction of Surface drain Length54m