As per PPR-2008(latest revised), as per BWDB instruction time to time and as stated in tender document.
Barguna 02 / 2018-2019. Re-excavation of Gabbaria Khal from km 0.00 to km 8.400 8.40 km between Polder- 40/1 and 40/2 at Pathorghata Bagruna under Re-excavation of small river khal & water bodies in 64 Districts Phase-1 under Barguna O&M Division BWDB Barguna during the year 2018-2019.