View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Date of submission of tender has been extended due to unavoidable circumstances. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 02/01/2019 16:00 | 07/01/2019 16:00 |
| Opening Date & Time | 03/01/2019 12:20 | 08/01/2019 12:20 |
| Last date & time for Tender/Proposal Security Submission | 27/12/2018 11:00 | 08/01/2019 11:00 |
| Closing Date & Time | 03/01/2019 12:20 | 08/01/2019 12:20 |
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Date of submission of tender has been extended due to unavoidable circumstances. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 26/12/2018 16:00 | 02/01/2019 16:00 |
| Eligibility of Consultant | Any individual(s)/ firm(s) who fulfill the qualification(s) criteria stipulated in the Tender Data Sheet (TDS) and other conditions of Tender Document Tender security may be submitted in the form of Irrevocable bank grantee in favor of Executive Engineer, Panchagarh O&M Division, BWDB, Panchagarh. N.B: 1) The tender has been prepared according to preliminary working design. The quantity of work to be finalize according to pre-work and final working design which will be prepare before execution of work. 2) Payment will be made according to budget allocation. 3) Detail photograph/video (before starting work & after final work) will be submitted by contractor with his own cost along with bill of work. 4) Decision will finalize according to existing rules & office order of BWDB. Some instruction of BWDB is attached in tender document(Section-8). 5) The contractor has to arrange the land for execution of works by his/her own initiative. In this regards no claim with be entertained. |
Any individual(s)/ firm(s) who fulfill the qualification(s) criteria stipulated in the Tender Data Sheet (TDS) and other conditions of Tender Document Tender security may be submitted in the form of Irrevocable bank grantee in favor of Executive Engineer, Panchagarh O&M Division, BWDB, Panchagarh. N.B: 1) The tender has been prepared according to preliminary working design. The quantity of work to be finalize according to pre-work and final working design which will be prepare before execution of work. 2) Payment will be made according to budget allocation. 3) Detail photograph/video (before starting work & after final work) will be submitted by contractor with his own cost along with bill of work. 4) Decision will finalize according to existing rules & office order of BWDB. Some instruction of BWDB is attached in tender document(Section-8). 5) The contractor has to arrange the land for execution of works by his/her own initiative. In this regards no claim with be entertained. |
| Opening Date & Time | 27/12/2018 12:20 | 03/01/2019 12:20 |
| Closing Date & Time | 27/12/2018 12:20 | 03/01/2019 12:20 |
| Brief Description of Goods,Works or Service | Re-excavation of Buriteesta River from Km.4.000 to Km. 24.000= 20.000 Km. under Re-excavation of small river khal and water bodies in 64 districts 1st Phase at Debigonj Upazila District-Panchagarh under BWDB Panchagarh during the year 2018-19 |
Re-excavation of Buriteesta River from Km.4.000 to Km. 24.000= 20.000 Km. under Re-excavation of small river khal and water bodies in 64 districts 1st Phase at Debigonj Upazila District-Panchagarh under BWDB Panchagarh during the year 2018-19 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum at TDS |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years. years counting backward from the date of publication of IFT in the newspaper
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 5 (Five) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5 (Five) years, with a value of at least Tk. 360.00 Lakh (Three hundred sixty lakh) only. Hear similar nature of work means"earth work/dredging".
years counting backward from the date of publication of IFT in the newspaper
|
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5 (Five) years. years counting backward from the date of publication of IFT in the newspaper
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 10 (Ten) years, with a value of at least Tk. 360.00 Lakh (Three hundred sixty lakh) only. Hear similar nature of work means "Earthwork (River/khal/canal/embankment/earthen road), Spur, Groyne, Revetment, Regulator, Rubber Dam, Sluice, Siphon, Aqueduct, Bridge, Culvert".
years counting backward from the date of publication of IFT in the newspaper
|
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | 3482.pdf | Office order for Similar nature of work | 136438 | ||