View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | This corrigendum/amendment has been made due to unavoidable circumstances: |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 31/12/2018 13:00 | 06/01/2019 13:00 |
| Eligibility of Consultant | 1. Tenderer must be resistered in e-GP Web portal. |
1. Tenderer must be resistered in e-GP Web portal. |
| Opening Date & Time | 31/12/2018 14:00 | 06/01/2019 14:00 |
| Last date & time for Tender/Proposal Security Submission | 31/12/2018 13:45 | 06/01/2019 13:45 |
| Start Date(Lot No : Lalmonirhat-W-11/2018-2019) | 06/01/2019 | 13/01/2019 |
| Closing Date & Time | 31/12/2018 14:00 | 06/01/2019 14:00 |
| Brief Description of Goods,Works or Service | Re-excavation of Soti river from Km 47.00 to Km 56.00 in UZ-Lalmonirhat Sadar Dist-Lalmonirhat under Lalmonirhat O&M Division BWDB Lalmonirhat. |
Re-excavation of Soti river from Km 47.00 to Km 56.00 in UZ-Lalmonirhat Sadar Dist-Lalmonirhat under Lalmonirhat O&M Division BWDB Lalmonirhat. |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | The corrigendum/amendment has been made due to unavoidable circumstances in Section -2 (TDS) of Tender Document Sheet (ITT Clause 15.1(b) : Experience Criteria) |
| Field Name | Old Value | New Value |
|---|---|---|
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 3 (Three) years. [years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 10 (Ten)] years, each with a value of at least Tk. 270 (Two Hundred Seventy) Lakh
[years counting backward from the date of publication of IFT in the newspaper] Similar works like as Earth Work (any type)
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 3 (Three) years. [years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1 (One) contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 10 (Ten)] years, each with a value of at least Tk. 270 (Two Hundred Seventy) Lakh
[years counting backward from the date of publication of IFT in the newspaper] Similar works like as Earthwork (river/khal/canal/embankment/earthen road), Spur, Groyne, Revetment, Regulator, Rubber Dam, Sluice, Siphon, Aqueduct, Bridge, Culvert.
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Corrigendum Notice.pdf | Corrigendum Notice | 1378690 | ||