01. A satisfactory Completion for Installation/Rehabilitation of 11kV or above Overhead/Underground line in a single work order amounting not less than Tk. 5,00,000/- (Five lac) within last 05 (Five) years shall be required.
02. The required average annual construction Turnover shall be greater than Tk. 20,00,000/- (Twenty lac) over the last 05 (Five) years.
03. The minimum Amount of Liquid Asset or working capital or credit facilities of the Tenderer shall be Tk. 5,00,000/- (Five lac) only shall be supported by bank statement or Bank certificates of valid credit facilities or valid FDR not before 04/06/2015 (with Letter of Commitment for Bank as Form PW3-7).
Installation of 200 kVA 11/0.4 kV Pole mounted S/S to reduce load of Overloaded Transformers and Renovation of Distribution Network within the Jurisdiction of Shitalakha NOCS Division.