View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Additional following special instructions will be part of e-tender document: The target for completion of the project is 2015-16 financial year and in no case completion time of the project will be extended. Moreover, Ministry of Water Resources has confirmed the additional fund required for payment of all bills beyond the initial allocation of Tk. 115.00 crore for the project. Upto 3rd installment, Tk. 115.00 crore will be paid to the contractors and final amount (all outstanding bills) will be paid in the month of June’2016 after receiving 4th Installment. Moreover, the Tenderers must agree with the TIME SCHEDULE attached herewith and signed TIME SCHEDULE must be uploaded alongwith other documents during e-Tender submission. |
| Field Name | Old Value | New Value |
|---|---|---|
| Brief Description of Goods,Works or Service | Manufacturing, Placing & Dumping of CC Blocks of different sizes in connection with Protection of 800.00 m (M3800.00-M4600.00) at Kadamtali of left Bank of Jamuna River of Segment Horindhara to Hargila Special Instructions: 01. Tenderers should visit the working site before submission of tender. 02. Tenderers have to clean the bank slope as required with his/their own arrangement for which no extra claim will be entertained.. 03. Payment will be made subject to availability of fund upon completion of part or full of the work on proportion basis. 04. Notification of Award (NOA) will be issued after getting proper administrative approval from the competent authority. 05. No claim whatsoever will be entertained if NOA is not issued. 06. The minimum amount of liquid assets or working capital or credit Lines ( in Form PW3-7 attached) of the Tenderer shall be Tk 290.00 lakh. In case of Bank statement or Credit Lines from scheduled Bank of Bangladesh to be issued within 21 (Twenty One) days before the deadline of submission of Tender. 07. Analysis Template of BOQ, Credit Lines form and Design Drawings are attached in Section No. 9. |
Manufacturing, Placing & Dumping of CC Blocks of different sizes in connection with Protection of 800.00 m (M3800.00-M4600.00) at Kadamtali of left Bank of Jamuna River of Segment Horindhara to Hargila Special Instructions: 01. Tenderers should visit the working site before submission of tender. 02. Tenderers have to clean the bank slope as required with his/their own arrangement for which no extra claim will be entertained.. 03. Payment will be made subject to availability of fund upon completion of part or full of the work on proportion basis. 04. Notification of Award (NOA) will be issued after getting proper administrative approval from the competent authority. 05. No claim whatsoever will be entertained if NOA is not issued. 06. The minimum amount of liquid assets or working capital or credit Lines ( in Form PW3-7 attached) of the Tenderer shall be Tk 290.00 lakh. In case of Bank statement or Credit Lines from scheduled Bank of Bangladesh to be issued within 21 (Twenty One) days before the deadline of submission of Tender. 07. Analysis Template of BOQ, Credit Lines form and Design Drawings are attached in Section No. 9. 08. The target for completion of the project is 2015-16 financial year and in no case completion time of the project will be extended. Moreover, Ministry of Water Resources has confirmed the additional fund required for payment of all bills beyond the initial allocation of Tk. 115.00 crore for the project. Upto 3rd installment, Tk. 115.00 crore will be paid to the contractors and final amount (all outstanding bills) will be paid in the month of June’2016 after receiving 4th Installment. Moreover, the Tenderers must agree with the TIME SCHEDULE attached herewith and signed TIME SCHEDULE must be uploaded alongwith other documents during e-Tender submission. |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Time Schedule_Package #HH-RBP-3B.pdf | Time Schedule | 346092 | ||