View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 4
|
|
| Amendment / Corrigendum Text : | Due to unavoidable circumstances, needs some amendment in tender document and some correction also needed in BOQ. Additional Forms to be filled by the Tenderer (Form 1-7) uploaded in Amendment Section. Amendment also uploaded. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 09/04/2019 17:00 | 15/04/2019 17:00 |
| Opening Date & Time | 10/04/2019 13:00 | 16/04/2019 13:00 |
| PCC---- | 19.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel, as referred to in the PCC, to carry out the functions stated in the Schedule or other personnel approved by the Project Manager. The Contractor shall employ the key personnel named in the Schedule of Key Personnel, as referred to in the PCC, to carry out the functions stated in the Schedule or other personnel approved by the Project Manager. The Technical Personnel for construction work are as follows :
Position Minimum qualification Number Experience in Road Works |
19.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel, as referred to in the PCC, to carry out the functions stated in the Schedule or other personnel approved by the Project Manager. The Contractor shall employ the key personnel named in the Schedule of Key Personnel, as referred to in the PCC, to carry out the functions stated in the Schedule or other personnel approved by the Project Manager. The Technical Personnel for construction work are as follows :
Position Minimum qualification Number Experience in Road Works |
| Last date & time for Tender/Proposal Security Submission | 10/04/2019 12:00 | 16/04/2019 12:00 |
| Closing Date & Time | 10/04/2019 13:00 | 16/04/2019 13:00 |
| TDS/PDS---- | ITT 30.1 Technical Proposal must include the following chapters:
b. Equipment: Tenderer will provide the list of equipment (lease or own with proof of documents with source) that will be used if the contract is awarded and its time frame. The statement should be realistic enough that not only satisfy the ITT Clause 18 but also satisfy the equipment schedule (time and activities involved, number of equipment and type, WMM and Bitumen batching plant and its capacity, equipment brand and year of manufacture, etc.) for ensuring the progress of the contract as per work plan. Tenderer will mention the brand of the equipment as well as engine number where applicable. The equipment, with detail description, mobilization schedule will be submitted by the tenderer which will be an integral part of the contract. Before submitting the tender, tenderer shall visit the proposed site and submit the construction equipment accessibility plan and also mentioned the mode of construction equipment mobilization. c. Personnel: Tenderer will provide the list of experienced personnel which will be available during execution of the contract as specified if awarded. The responsibility and availability of the personnel to execute the contract will be submitted in the proposal. The statement should be realistic enough that not only satisfy the ITT Clause 17 but also satisfy the personnel schedule (time and activities involved) for ensuring the progress of the contract as per work plan. Availability of personnel must confirm before signing the contract. If replacement require procuring entityâ??s prior approval will be obtained and replaced person must possess equal or higher qualification. d. Work plan: Tenderer will provide a work plan in details as well as list all activities/sub activities to be performed under the contract within the given time frame. Please provide the date of every milestone also. Only bar chart is not acceptable. In work plan tenderer will describe each activities/sub activities with duration, milestones and predecessor & successor actions of every activity. PERT/CPM using MS Project will be more acceptable.
Others: Any other statement or documents that tenderer needs to describe the Technical proposal to satisfy his/her proposal may be mentioned in the technical proposal. Any tenderer may be invited to present the technical proposal to TEC/or LGED expert group and Procuring Entityâ??s comments must be incorporated in final technical proposal which will then be an integral part of the contract. |
ITT 30.1 Technical proposal must include:
2. Equipment: The list of required equipment details is as specified in TDS 18.1. 3. Personnel: The list of required personnel details is as specified in TDS 17.1.
4. Schedule: Schedule of the activities to be performed should be submitted graphically. |
| TDS/PDS---- |
The Contractor shall employ (mandatory) for the construction work the technical personnel named and approved by the Project Manager. The Project Manager will approve any proposed replacement of technical personnel only if their relevant qualifications and abilities are substantially equal to or better than those of the personnel stated in the Contract Data. |
17.1 Tenderer shall have the minimum level of personnel capacity to qualify for the performance of the Works under the Contract consisting of a Construction Project Manager, Engineers, and other key staff with qualifications and experience as specified in the TDS;
The Contractor shall employ (mandatory) for the construction work the technical personnel named and approved by the Project Manager. The Project Manager will approve any proposed replacement of technical personnel only if their relevant qualifications and abilities are substantially equal to or better than those of the personnel stated in the Contract Data. |
| TDS/PDS---- | 18.1 Tenderer shall own suitable equipment and other physical facilities or have proven access through contractual arrangement to hire or lease such equipment or facilities for the desired period, where necessary or have assured access through lease, hire, or other such method, of the essential equipment, in full working order, as specified in the TDS.
Tenderer shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
(Information to be submitted according to the Form 5 attached in section 7) |
18.1 Tenderer shall own suitable equipment and other physical facilities or have proven access through contractual arrangement to hire or lease such equipment or facilities for the desired period, where necessary or have assured access through lease, hire, or other such method, of the essential equipment, in full working order, as specified in the TDS.
Tenderer shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
(Information to be submitted according to the Form 5 attached in this Amedment) |
| TDS/PDS--C. Qualification Criteria-- |
a) The minimum number of years of general experience of the tenderer in the construction works as Prime Contractor shall be 5 (Five) years, counting backward from the date of publication of IFT in the newspaper/e-GP web portal including experience of all types of works as listed in ITT 1, brief description of the works. (The certificate shall be submitted according to the attached format, Form 1, and Information must be submitted according to the Form 2 attached in section 9.) |
Clause:15.1 a) The minimum number of years of general experience of the tenderer in construction works as prime contractor or Joint Venture, Consortium or Associations (JVCA) partner shall be five (5) years, counting backward from the date of publication of IFT in the e-GP web portal/ newspaper, including experience of all types of works as listed in ITT 1, brief description of the works. b) The minimum specific experience as a prime contractor or JVCA partner in construction works of a nature, complexity and methods/construction technology similar to the proposed Works in at least one (1) contract successfully completed within the last seven (7) years , where the value of the Tenderer’s participation exceeds Tk. 28,00,00000.00 (Taka Twenty Eight Crore Only); counting backward from the date of publication of IFT in the e-GP web portal/ newspaper. The similarity of tenderer’s experience shall be based on road works or road improvements works. (The certificatet to be submitted according to the attached format, Form 1, and Information to be submitted according to the Form 2 attached in this Amendment.) |
| TDS/PDS--C. Qualification Criteria-- |
(a) The required average annual construction turnover (AACT) i.e. total certified payments received for contracts in progress or completed shall be greater than 32,25,00000.00 (Taka Thirty Two Crore Twenty Five Lac Only) over the last 05 (five) years, (years counting backward from the date of publication of IFT in the e-GP web portal) (Information shall be submitted according to the Form 3 attached in section 9) |
Clause:16.1 (a) The required average annual construction turnover (AACT) i.e. total certified payments received for contracts in progress or completed shall be greater than 32,25,00000.00 (Taka Thirty Two Crore Twenty Five Lac Only) over the last 05 (five) years, (years counting backward from the date of publication of IFT in the e-GP web portal) (Information to be submitted according to the Form 3 attached in this amendment.) (b) The minimum amount of liquid assets (LA) or working capital or credit facilities or credit line(s) of the Tenderer shall be Tk. 5,25,00000.00 (Taka Five Crore Twenty Five Lac Only) net of other contractual commitments to be provided in form-6: Financial requirement for current contract commitment attached in this Amendmnet [Bank Statement of day end closing balance / credit line(s) issued by any scheduled Bank of Bangladesh not earlier than 28 (twenty-eight) days prior to the day of the original deadline for submission of Tenders for the Contract. Credit line(s) issued by any scheduled Bank of Bangladesh in the format as specified in Form (PW3–7) which is attached in section-8 without any alteration.
Credit facilities should be substantiated by credit sanction letter from any scheduled Bank of Bangladesh. (c) All pending litigation and arbitration, if any, shall be treated as resolved against the bidder and so shall in total not represent more than 50% of the Bidder’s net worth calculated as the difference between total assets and total liabilities. (information to be provided in form-7: Pending Litigation and arbitration attached in this Amendment)
|
| Amendment / Corrigendum/ Addendum No. : | 4 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Form 1_Completion Certificate format.docx | Form 1_Completion Certificate | 24898 | ||
| 2 | Form 2_Similar Exp. Information.xlsx | Form 2_Similar Exp. Information | 15558 | ||
| 3 | Form 3_Turnover Information.xlsx | Form 3_Turnover Information | 16170 | ||
| 4 | Form 4_Personnel Information.xlsx | Form 4_Personnel Information | 13390 | ||
| 5 | Form 5_Equipment Information.xlsx | Form 5_Equipment Information | 14134 | ||
| 6 | form-6_Financial requirement for current contract commitment.xlsx | form-6 financial requirment | 14670 | ||
| 7 | form-7_Pending Litigation and Arbitration.xlsx | form-7-pending litigation | 14396 | ||
| 8 | Amendment to Tender Document (CW-23) - 20-3-19.docx | Amendment | 63552 | ||
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Due to unavoidable circumstances, Tender closing and opening date will be corrected |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 18/03/2019 17:00 | 09/04/2019 17:00 |
| Opening Date & Time | 19/03/2019 13:00 | 10/04/2019 13:00 |
| Meeting End Date & Time | 07/03/2019 17:00 | 25/03/2019 17:00 |
| Last date & time for Tender/Proposal Security Submission | 19/03/2019 12:00 | 10/04/2019 12:00 |
| Closing Date & Time | 19/03/2019 13:00 | 10/04/2019 13:00 |
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Due to unavoidable circumstances, some correction is needed for last selling and dropping date & time. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 03/03/2019 17:00 | 18/03/2019 17:00 |
| Opening Date & Time | 04/03/2019 13:00 | 19/03/2019 13:00 |
| Meeting End Date & Time | 25/02/2019 17:00 | 07/03/2019 17:00 |
| Last date & time for Tender/Proposal Security Submission | 04/03/2019 12:00 | 19/03/2019 12:00 |
| Closing Date & Time | 04/03/2019 13:00 | 19/03/2019 13:00 |
| TDS/PDS--B. e-Tender Document (e-TD)-- | Pre- Tender meeting :
Online Pre- Tender meeting:
Offline Pre- Tender meeting: |
Pre- Tender meeting :
Online Pre- Tender meeting:
Offline Pre- Tender meeting: |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to some unavoidable circumstances some correction needed in the last sailing and dropping date. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 27/02/2019 17:00 | 03/03/2019 17:00 |
| Eligibility of Consultant |
As Per Tender Document. |
As Per Tender Document. |
| Opening Date & Time | 28/02/2019 13:00 | 04/03/2019 13:00 |
| Meeting End Date & Time | 12/02/2019 17:00 | 25/02/2019 17:00 |
| Last date & time for Tender/Proposal Security Submission | 28/02/2019 12:00 | 04/03/2019 12:00 |
| Closing Date & Time | 28/02/2019 13:00 | 04/03/2019 13:00 |
| TDS/PDS--B. e-Tender Document (e-TD)-- | Pre- Tender meeting :
Online Pre- Tender meeting:
Offline Pre- Tender meeting: |
Pre- Tender meeting :
Online Pre- Tender meeting:
Offline Pre- Tender meeting: |
| Brief Description of Goods,Works or Service | CW-23/RCIP/BBR.. |
CW-23/RCIP/BBR.. |