View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 4
|
|
| Amendment / Corrigendum Text : | Corrigendum due to unavoidable circumstance Additional Forms to be filled by the Tenderer (Form 1-7 uploaded in Amendment Section)
If any Tenderer already submitted , please the tenderer again substitute/Modification |
| Field Name | Old Value | New Value | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Document last selling date & time | 09/04/2019 17:00 | 15/04/2019 17:00 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Opening Date & Time | 10/04/2019 13:00 | 16/04/2019 13:00 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- |
The Contractor shall employ the key personnel named in the Schedule of Key Personnel, as referred to in
|
19.1 The Contractor shall employ the key personnel named in the Schedule of Key Personnel, as referred to in
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--A. General-- | The minimum insurance cover shall be:
|
37.1 The minimum insurance cover shall be:
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- |
The date by which â??as-builtâ?� drawings are required is 07 (seven) days before the Issuance of Completion Certificate of Section A. |
84.1 The date by which “as-built” drawings are required is 07 (seven) days before the Issuance of Completion Certificate of Section A. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| PCC--E. Completion of the Contract-- | The amount to be withheld for failing to produce â??as-builtâ?� drawings by the date required is Tk.500,000.00 |
84.2 The amount to be withheld for failing to produce “as-built” drawings by the date required is Tk.500,000.00 |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Meeting End Date & Time | 31/03/2019 17:00 | 04/04/2019 17:00 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Last date & time for Tender/Proposal Security Submission | 09/04/2019 17:00 | 15/04/2019 17:00 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Closing Date & Time | 10/04/2019 13:00 | 16/04/2019 13:00 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | a) The minimum number of years of general experience of the tenderer in the construction works as Prime Contractor shall be 5 (Five) years, counting backward from the date of publication of IFT in the newspaper/e-GP web portal including experience of all types of works as listed in ITT 1, brief description of the works. b) The minimum specific experience as a prime Contractor in similar improvement works of at least 1(one) contract(s) successfully completed within the last 5(five) years, with a value of at least 41,80,00000.00 (Taka Forty One Crore Eighty Lac Only); counting backward from the date of publication of IFT in the in the e-GP web portal/ newspaper. The similarity of Tendererâ??s experience shall be based on improvement of minimum 23 kilometers or 85,100.00 sqm (pavement work without shoulder) of road works in single contract |
15.1 a) The minimum number of years of general experience of the tenderer in construction works as prime contractor or Joint Venture, Consortium or Associations (JVCA) partner shall be five (5) years, counting backward from the date of publication of IFT in the e-GP web portal/ newspaper, including experience of all types of works as listed in ITT 1, brief description of the works.
b) The minimum specific experience as a prime contractor or JVCA partner in construction works of a nature, complexity and methods/construction technology similar to the proposed Works in at least one (1) contract successfully completed within the last seven (7) years , where the value of the Tenderer’s participation exceeds Tk41,80,00000.00 (Taka Forty One Crore Eighty Lac Only); counting backward from the date of publication of IFT in the e-GP web portal/ newspaper. The similarity of tenderer’s experience shall be based on road works or road improvements works. |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | (a) The required average annual construction turnover (AACT) i.e. total certified payments received for contracts in progress or completed shall be greater than 48,23,00,000.00 (Taka Forty Eight Crore Twenty Three lac Only) over the last 05 (five) years, (years counting backward from the date of publication of IFT in the e-GP web portal) (b) The minimum amount of liquid assets (LA) or working capital or credit facilities or credit line(s) of the Tenderer shall be 8,00,00000.00 (Taka Eight Crore Only) net of other contractual commitments. (Bank Statement of day end closing balance / credit line(s) issued by any scheduled Bank of Bangladesh not earlier than 28 (twenty-eight) days prior to the day of the original deadline for submission of Tenders for the Contract)
[credit line(s) issued by any scheduled Bank of Bangladesh in the format as specified Form (PW3â??7) which is attached in section-8 without any alteration, credit facilities should be substantiated by credit sanction letter and working capital may be in the form of bank statement or recent/current audit report (not before FY 2017-2018)] |
16.1 (a) The required average annual construction turnover (AACT) i.e. total certified payments received for contracts in progress or completed shall be greater than 48,23,00,000.00 (Taka Forty Eight Crore Twenty Three lac Only) over the last 05 (five) years, (years counting backward from the date of publication of IFT in the e-GP web portal) 16.1(b) The minimum amount of liquid assets (LA) or working capital or credit facilities or credit line(s) of the Tenderer shall be Tk. 8,00,00000.00 (Taka Eight Crore Only) net of other contractual commitments to be provided in form-6: Financial requirement for current contract commitment attached in Amendment Section. [Bank Statement of day end closing balance / credit line(s) issued by any scheduled Bank of Bangladesh not earlier than 28 (twenty-eight) days prior to the day of the original deadline for submission of Tenders for the Contract. Credit line(s) issued by any scheduled Bank of Bangladesh in the format as specified in Form (PW3–7) which is attached in section-8 without any alteration.
Credit facilities should be substantiated by credit sanction letter from any scheduled Bank of Bangladesh.
16.1 (c) All pending litigation and arbitration, if any, shall be treated as resolved against the bidder and so shall in total not represent more than 50% of the Bidder’s net worth calculated as the difference between total assets and total liabilities. (information to be provided in form-7: Pending Litigation and arbitrationattached in Amendment Section) |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | The Contractor shall employ (mandatory) for the construction work the technical personnel named and approved by the Project Manager. The Project Manager will approve any proposed replacement of technical personnel only if their relevant qualifications and abilities are substantially equal to or better than those of the personnel stated in the Contract Data. A Construction Project Manager, Engineer, and other key staff shall have the following qualifications and experience:
|
17.1 The Contractor shall employ (mandatory) for the construction work and routine maintenance the technical personnel named and approved by the Project Manager. The Project Manager will approve any proposed replacement of technical personnel only if their relevant qualifications and abilities are substantially equal to or better than those of the personnel stated in the Contract Data. A. During Construction work: A Construction Project Manager, Engineer, and other key staff shall have the following minimum qualifications and experience:
(Information to be submitted according to the Form 4 attached in Amendment Section) |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| TDS/PDS--C. Qualification Criteria-- | Tenderer shall own or have proven access to hire or lease of the major construction equipments, in full working order as follows :
|
18.1 Tenderer shall own or have proven access to hire or lease of the major construction equipment, in full working order as follows:
(Information to be submitted according to the Form 5 attached in Amendment Section) |
| Amendment / Corrigendum/ Addendum No. : | 4 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Form 1_Completion Certificate format.docx | Form 1_Completion Certificate format | 24898 | ||
| 2 | Form 2_Similar Exp. Information.xlsx | Form 2_Similar Exp. Information | 15558 | ||
| 3 | Form 3_Turnover Information.xlsx | Form 3_Turnover Information | 16170 | ||
| 4 | Form 4_Personnel Information.xlsx | Form 4_Personnel Information | 13390 | ||
| 5 | Form 5_Equipment Information.xlsx | Form 5_Equipment Information | 14134 | ||
| 6 | form-6_Financial requirement for current contract commitment.xlsx | form-6_Financial requirement | 14670 | ||
| 7 | form-7_Pending Litigation and Arbitration.xlsx | form-7_Pending Litigation and Arbitration | 14396 | ||
|
Amendment / Corrigendum No. : 3
|
|
| Amendment / Corrigendum Text : | Corrigendum/ due to time change |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 19/03/2019 17:00 | 09/04/2019 17:00 |
| Opening Date & Time | 20/03/2019 13:00 | 10/04/2019 13:00 |
| Meeting End Date & Time | 12/03/2019 17:00 | 31/03/2019 17:00 |
| Last date & time for Tender/Proposal Security Submission | 19/03/2019 17:00 | 09/04/2019 17:00 |
| Closing Date & Time | 20/03/2019 13:00 | 10/04/2019 13:00 |
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Corrigendum due to unavoidable circumstance
All other terms & conditions will be remain unchanged. |
| Field Name | Old Value | New Value |
|---|---|---|
| Completion Date(Lot No : 01) | 31/03/2021 | 29/04/2021 |
| Document last selling date & time | 10/03/2019 17:00 | 19/03/2019 17:00 |
| Opening Date & Time | 11/03/2019 13:00 | 20/03/2019 13:00 |
| Meeting End Date & Time | 03/03/2019 17:00 | 12/03/2019 17:00 |
| Last date & time for Tender/Proposal Security Submission | 10/03/2019 17:00 | 19/03/2019 17:00 |
| Start Date(Lot No : 01) | 01/04/2019 | 01/05/2019 |
| Closing Date & Time | 11/03/2019 13:00 | 20/03/2019 13:00 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : |
Corrigendum due to unavoidable circumstance |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 24/02/2019 17:00 | 10/03/2019 17:00 |
| Eligibility of Consultant | Qualification Criteria : As per TDS |
Qualification Criteria : As per TDS |
| Opening Date & Time | 25/02/2019 13:00 | 11/03/2019 13:00 |
| Meeting End Date & Time | 17/02/2019 17:00 | 03/03/2019 17:00 |
| Last date & time for Tender/Proposal Security Submission | 24/02/2019 17:00 | 10/03/2019 17:00 |
| Closing Date & Time | 25/02/2019 13:00 | 11/03/2019 13:00 |
| Brief Description of Goods,Works or Service | Part-1: Improvement of Tengrakhola-Jalirpar G.C Road by BC at Ch. 10000-19000m (Effective Length = 8653.70m) under Muksudpur Upazila (Road ID No: 335582001) [ Salvage Materials Cost Tk. 71,30,356.70] ; Part-2: Improvement of Tilchara_Orakandi Road (Thakurbari) at Ch. 00-3650m under Kasiani Upazila (Road ID No: 335432014) [ Salvage Materials Cost Tk. Tk. 5,48,029.44]; Part-3: Improvement of Road from Boultali GC-Nizra UPC at Ch. 00-6380m (Effective Length = 6153m) under Sadar Upazila (Road ID No: 335323011) [ Salvage Materials Cost Tk. Tk. 1,13,73,219.51]; Part-4: Improvement of Bashbaria GC-Jhanjhania-Ghagor GC Road at Ch. 2700-12635m under Tungipara Upazila (Road ID No: 335912004) [ Salvage Materials Cost Tk. 16,16,114.30] ; Part-5: Improvement of Kadambari-Kaligonj-Gandiasur GC Road at Ch. 00-6256m under Kotalipara Upazila (Road ID No: 335512007); Part-6: Improvement of Road from Kajulia UPC-Domrasur Hat Road at Ch. 00-9800m under Sadar Upazila (Road ID No: 335323007) [Salvage Materials Cost Tk. 2,49,89,081.67] & Part-7: Improvement of Road from Gohala Hat (RHD)-Nizamkandi UPC Road (Sadar Portion) at Ch. 00-2750m under Sadar Upazila (Road ID No: 335323017) [Salvage Materials Cost Tk. 36,30,739.77]. |
Part-1: Improvement of Tengrakhola-Jalirpar G.C Road by BC at Ch. 10000-19000m (Effective Length = 8653.70m) under Muksudpur Upazila (Road ID No: 335582001) [ Salvage Materials Cost Tk. 71,30,356.70] ; Part-2: Improvement of Tilchara_Orakandi Road (Thakurbari) at Ch. 00-3650m under Kasiani Upazila (Road ID No: 335432014) [ Salvage Materials Cost Tk. Tk. 5,48,029.44]; Part-3: Improvement of Road from Boultali GC-Nizra UPC at Ch. 00-6380m (Effective Length = 6153m) under Sadar Upazila (Road ID No: 335323011) [ Salvage Materials Cost Tk. Tk. 1,13,73,219.51]; Part-4: Improvement of Bashbaria GC-Jhanjhania-Ghagor GC Road at Ch. 2700-12635m under Tungipara Upazila (Road ID No: 335912004) [ Salvage Materials Cost Tk. 16,16,114.30] ; Part-5: Improvement of Kadambari-Kaligonj-Gandiasur GC Road at Ch. 00-6256m under Kotalipara Upazila (Road ID No: 335512007); Part-6: Improvement of Road from Kajulia UPC-Domrasur Hat Road at Ch. 00-9800m under Sadar Upazila (Road ID No: 335323007) [Salvage Materials Cost Tk. 2,49,89,081.67] & Part-7: Improvement of Road from Gohala Hat (RHD)-Nizamkandi UPC Road (Sadar Portion) at Ch. 00-2750m under Sadar Upazila (Road ID No: 335323017) [Salvage Materials Cost Tk. 36,30,739.77]. |