View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | Attention to the Tenderers:
1. If the total quoted price is more than 10% (ten percent) less than the Engineer’s Estimate shall not be consider for Evaluation as per MRTB memo no. 35.00.0000.015.14.058.15-484 dated 22.06.2015.
2. If the total quoted price is more less or more above than 5% (five percent) than the Engineer’s Estimate, the tenderer shall submit item wise Analysis of Rates as per MRTB memo no. 35.00.0000.015.14.058.15-484 dated 22.06.2015. The Rate Analysis must be logical with the present market price. |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 16/08/2015 17:00 | 23/08/2015 17:00 |
| Eligibility of Consultant | All tenderers regardless of whether enlisted or not enlisted with the employer may submit Tenders provided that they are qualified as per Qualification Criteria Specified in the Tender Data Sheet (TDS) of the Tender Document. |
All tenderers regardless of whether enlisted or not enlisted with the employer may submit Tenders provided that they are qualified as per Qualification Criteria Specified in the Tender Data Sheet (TDS) of the Tender Document. Bitumin to be used shall be only 60/70 penetration grade for DBS (Dense Bituminous Surfacing) work. 1. If the total quoted price is more than 10% (ten percent) less than the Engineer’s Estimate shall not be consider for Evaluation as per MRTB memo no. 35.00.0000.015.14.058.15-484 dated 22.06.2015.
2. If the total quoted price is more less or more above than 5% (five percent) than the Engineer’s Estimate, the tenderer shall submit item wise Analysis of Rates as per MRTB memo no. 35.00.0000.015.14.058.15-484 dated 22.06.2015. The Rate Analysis must be logical with the present market price. |
| Opening Date & Time | 17/08/2015 16:00 | 24/08/2015 16:00 |
| Meeting End Date & Time | 02/08/2015 16:00 | 12/08/2015 16:00 |
| Last date & time for Tender/Proposal Security Submission | 17/08/2015 14:30 | 24/08/2015 14:30 |
| Closing Date & Time | 17/08/2015 15:00 | 24/08/2015 15:00 |
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | GCC Clause 57.1 The Defects Liability Period shall be amended as below in the “New Value”: |
| Field Name | Old Value | New Value |
|---|---|---|
| PCC--C. Quality Control-- |
The Defects Liability Period is 365 days after the date of completion of the work. |
The Defects Liability Period shall be 730 (Seven hundred thirty) days after the date of completion of the work. |