(a) The minimum number of years of General experience of the tenderer in the construction works as a prime contractor or sub-contractor or management contractor shall be 5 (five) years (Years counting backward from the date of publication of IFT in the e-GP System) (b) A satisfactory completion of similar works at least Tk. 18.00 (Eighteen) lac under a single contract over a period of 5 (five) years shall be required (Years counting backward from the date of publication of IFT in the e-GP System). (c) The required average annual construction turnover shall be greater than Tk. 30.00 ( thirty) lac. over the last five (5) years (Years counting backward from the date of publication of IFT in the e-GP System). Documents regarding annual construction turnover must be submitted in the form of year-wise payment certificate from the respective PE's Office. (d) ) The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 16.00 (sixteen lac Only) before tender closing date. Note for Liquid asset : In case of credit from the Bank it shall clearly mention the name of the work and Tender ID/ Tender Reference no. (e) Note: 1. As per consent of CPTU, the Tenders shall be evaluated in the e-GP system with help of online database system-TDMS. 2. Qualification information and evidences (such as work experience certificate, on-going works list, payment certificates for construction turnover, equipment list (own or rented), personnel list etc) of the Tenderers as mapped in the e-GP Tenders must be available in the TDMS system so that TEC can evaluate the tenders digitally within short period of time. 3. If there is any confliction information in TDMS and e-GP, the information provided in the e-GP system shall prevail. 4. A Tenderer not having sufficient information in the TDMS system may be evaluated as ineligible. 5. Evaluation Sheet generated by TDMS shall be uploaded into the e-GP system by the the TEC.
Supplying 1st class/P.J Bricks, Stone chips , Local sand, Pea-Gravels, wire Rope & U- Clamp at Amtola RHD Stackyard for Barisal Road sub-division -1 , under Barishal Road Division during the year 2018-2019.