Eligibility and conditions of the tenderer are shown in TDS of tender documents.
At CD Branch Line Construction of bank protection wall at km 29/7-8 Both Side 200 rft and Guide Wall at CTG end both side of Bridge No. CD/38 at km 30/7-9 and construction of ballast protection wall 4x150 rft 600 rft with other allied works as per approved drawing including repairs to cess and bank with other allied works.