1. A satisfactorily completion of similar works of at least TK. 10,00,000.00 (Ten lac ) only under 02 (two) number of contract(s) over a period of 03 (thee) years shall be required. 2. The required average annual construction turnover shall be greater than TK. 14,00,000.00 (Fourteen lac) only over the last 03 (three) years. 3. The minimum amount of liquid assets or working capital or credit facilities of the tenderer shall be TK. 10,00,000.00 (Ten lac) only. 4. The minimum capital shall be 12,00,000.00 (Twelve lac) only.
Rrenovation of pond & protection against land sliding by filling excavated earth from the bottom of pond including construction of Walk Way around the pond at Head Office, Chattogram.