Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | The required average annual construction turnover mentioned in the TDS for ITT clause 16.1(a) in Financial criteria to be read as follows:-
|
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | All e-GP registered tenderers in Bangladesh & who fulfill the qualification criteria as below: 1. The minimum number of years of general experience of the Tenderer in construction works as Prime Contractor or Subcontractor or Management Contractor shall be ten (10) years ( duration counting backward from the date of publication of the tender in the website). 2. The minimum specific experience as Prime Contractor or Subcontractor or Management Contractor in construction works of at least one (1) contract of Construction of flexible pavement work successfully completed within the last 8(Eight) years, with a value of at least Tk. 7.50(Seven point Five) crore.And construction works of at least one (1) contract of Construction of RCC Box culvert work successfully completed within the last 8(Eight) years, with a value of at least Tk. 1.25(One point Two Five) crore 3. The required average annual construction turnover shall be greater than Tk. 15.00 (Fifteen) crore over the best three (3) years in the last five (5) years; years counting backward from the date of publication of the tender in the website. 4. The minimum amount of liquid assets i.e, working capital or credit line(s) of the tenderers shall be Tk. 4.00 (Four) crore. Note : (a) The tenderer must attach authorization letter for submission of this particular tender. (b) If the quoted rate of any item deviates more than five percent (5%) compared to the RHD Rate Schedule, 2011, the tenderer should necessarily submit the Rate Analysis in support of the workability of the Rate. (c) In case of Joint Venture all partners should have experience of successful completion of similar nature of work. (d) All bituminous works should be done with bitumen of penetration grade 60-70. (e) If the contractor leaves the work incomplete or shows apathy to complete the work or in case of delayed completion compared to |
The required average annual construction turnover mentioned in the TDS for ITT clause 16.1(a) in Financial criteria to be read as follows- all other terms & condition will remain unchanged as per old value |