View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | To Correct Tender Document |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 16/06/2019 17:00 | 23/06/2019 17:00 |
| Eligibility of Consultant | As described in ITT Clause and TDS |
As described in ITT Clause and TDS |
| Opening Date & Time | 17/06/2019 11:00 | 24/06/2019 11:00 |
| PCC--A. General-- |
The Project Manager is
|
The Project Manager is concern Upazila Engineer |
| PCC--C. Quality Control-- | The Defects Liability Period is [state months]
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season]. |
The Defects Liability Period is twelve (12) months from the date of completion. |
| PCC--D. Cost Control-- |
The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is [insert percentage] percent of its Contract price per day of delay.
The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
|
The amount of Liquidated Damages or in other words Delay Damages for the uncompleted Works or any part thereof is 0.05% (percent) of its Contract price per day of delay. |
| PCC--F. Termination and Settlement of Disputes-- | The percentage to apply to the contract value of the works not completed, representing the PEâ??s additional cost for completing the uncompleted Works, is [state percentage] percent.
[ usually between ten (10) to twenty (20) percent depending on the nature of the Works] |
The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is: |
| Last date & time for Tender/Proposal Security Submission | 16/06/2019 17:00 | 23/06/2019 17:00 |
| Closing Date & Time | 17/06/2019 11:00 | 24/06/2019 11:00 |
| TDS/PDS--C. Qualification Criteria-- | The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be [state number] years. [a minimum of three (3) years would be deemed reasonable; years counting backward from the date of publication of IFT in the newspaper]
The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least [state number] contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last [state number] years, each with a value of at least Tk. [state amount].
[the minimum number of contracts will depend upon the size and type of construction work, and the PE should make its own judgement based upon its experience in the sector and construction industry. For example, for large works, it could be one (1) contract of similar nature during the last three (3) years or five (5) years or ten (10) years (whichever appropriate); years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, only when applicable, shall be mentioned separately for each lot in the package] |
The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Management Contractor shall be 5(five) years. The minimum specific experience as a Prime Contractor or Management Contractor in construction works of at least 01contract(s) of similar nature, complexity and methods/construction technology successfully completed within the last 5(five) years, each with a value of at least Tk. 97.68 Lac
|
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.
[ the required average annual construction turn over is recommended to be about twice the estimated annual cash flow for the Contract; however the multiplier may vary from 1.0 to 2.0, the larger the Contract size the lesser the multiplier should be. The period may be best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate) ; years counting backward from the date of publication of IFT in the newspaper]
The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk [state amount]
[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractorâ??s monthly certificate, allowing time to prepare an invoice, for the Project Managerâ??s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Therefore, the minimum required liquid asset will be Tk 4 Cr., i.e. 3 months cash flow based on the above assumptions.] |
The required average annual construction turnover shall be greater than Tk 87.91 Lac only over a period of last 05[Five] years.
-Tender shall demonstrate the resources sufficient to meet the aggregate of the value for the individual contracts/contractual commitments, incase, participation is more than one package /lot from same procuring entity and other procuring entity (ies). The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk48.84 Lac -Tender shall demonstrate the resource sufficient to meet the aggregate of the value for the individual contracts /contractual commitments, in case, participation is more than one package/lot from same procuring entity and other procuring entity (ies).
-Banking instrument - authenticated by bank statement, saving instrument from any scheduled bank.
-Credit line -authenticated by any scheduled bank in the format as specified (Form PW2a-3) without alteration.Failing to that the tender shall be treated as non-responsive |
| TDS/PDS--C. Qualification Criteria-- |
The minimum capacity shall be:[70%-80% of the official estimated cost]
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
The minimum capacity shall be: 136.75 Lac
Where
Note 1: In case the value of N is less than 12 (twelve) months the value of N shall be considered as 01 (one) |
| Brief Description of Goods,Works or Service | Improvement of Mirgonj Hat GC Jaldhaka-Domar RHW (Kaligonj Klinic ) Via Shimulbari Asrayan Project Road.(Ch. 3850-5492m)(Raod ID-173362010). [Jaldhaka] |
Improvement of Mirgonj Hat GC Jaldhaka-Domar RHW (Kaligonj Klinic ) Via Shimulbari Asrayan Project Road.(Ch. 3850-5492m)(Raod ID-173362010). [Jaldhaka] |