View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Railways Division :
Organization : Bangladesh Railway Procuring Entity Name : Divisional Engineer-2, Dhaka
Procuring Entity Code : Procuring Entity District : Dhaka
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : BR/DA2/WK/REV/18-19/37(SRG station yard) Tender/Proposal Status :
App ID : 148644 Tender/Proposal ID : 307153
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Revenue
Source of Funds : Government
Particular Information :
Project Code : Not applicable Project Name : Not applicable
Tender/Proposal Package No. and Description : DA-2/e-GP/18-19/47
At SSAE/Works/KRF section-Re-construction of cracked bed block one side of bridge No. 144 at Km-285-1-2 and bridge No. 191 at Km-307-5-6 including temporary arrangement and petty repairs to bridge No-105 at Km-265-2-3.
Category : Works for complete or part construction and civil engineering work; Construction work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works
Scheduled Tender/Proposal Publication
Date and Time :
30-Apr-2019 11:30 Tender/Proposal Document last selling /
downloading Date and Time :
15-May-2019 10:14
Pre - Tender/Proposal meeting Start
Date and Time :
30-Apr-2019 14:30 Pre - Tender/Proposal meeting End
Date and Time :
30-Apr-2019 15:30
Tender/Proposal Closing
Date and Time :
15-May-2019 12:30 Tender/Proposal Opening
Date and Time :
15-May-2019 12:30
Last Date and Time for Tender/Proposal Security
Submission :
15-May-2019 11:30    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As stated on the tender document

Brief Description of Works :

At SSAE/Works/KRF section-Re-construction of cracked bed block one side of bridge No. 144 at Km-285-1-2 and bridge No. 191 at Km-307-5-6 including temporary arrangement and petty repairs to bridge No-105 at Km-265-2-3.

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 500
Mode of Payment :
Tender/Proposal Security Valid Up to : 10-Sep-2019
Tender/Proposal Valid Up to : 13-Aug-2019
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
3 At SSAE/Works/KRF section-Re-construction of cracked bed block (one side) of bridge No. 144 at Km-285-1-2 and bridge No. 191 at Km-307-5-6 including temporary arrangement and petty repairs to bridge No-105 at Km-265-2-3. Kulaura section 44000 30-May-2019 28-Nov-2019
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : Md. Ahsan Jabir Designation of Official Inviting Tender/Proposal : DEN,DME,DSTE,DEE,DCO,DTO
Address of Official Inviting Tender/Proposal :
Address: Railway Administrative Building, Kamalapur, Dhaka.
City: Dhaka
Thana: Shahjahanpur
District: Dhaka - 1217
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 02-9330522
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Due to unavoidable circumstences the folowing changes has been made to the Tender Document.

Field Name Old Value New Value
Eligibility of Consultant

As stated on the tender document

As stated on the tender document

PCC--B. Time Control--

The Intended Completion Date for the whole of the Works shall be 180 days from start of works
 

The Intended Completion Date for the whole of the Works shall be 180 (One hundred eighty) days from start of works.
 

Brief Description of Goods,Works or Service

At SSAE/Works/KRF section-Re-construction of cracked bed block one side of bridge No. 144 at Km-285-1-2 and bridge No. 191 at Km-307-5-6 including temporary arrangement and petty repairs to bridge No-105 at Km-265-2-3.

At SSAE/Works/KRF section-Re-construction of cracked bed block one side of bridge No. 144 at Km-285-1-2 and bridge No. 191 at Km-307-5-6 including temporary arrangement and petty repairs to bridge No-105 at Km-265-2-3.

 