View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Due to unavoidable circumstences the folowing changes has been made to the Tender Document. |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | As stated on the tender document |
As stated on the tender document |
| PCC--B. Time Control-- |
The Intended Completion Date for the whole of the Works shall be 180 days from start of works |
The Intended Completion Date for the whole of the Works shall be 180 (One hundred eighty) days from start of works. |
| Brief Description of Goods,Works or Service | At SSAE/Works/KRF section-Re-construction of cracked bed block one side of bridge No. 144 at Km-285-1-2 and bridge No. 191 at Km-307-5-6 including temporary arrangement and petty repairs to bridge No-105 at Km-265-2-3. |
At SSAE/Works/KRF section-Re-construction of cracked bed block one side of bridge No. 144 at Km-285-1-2 and bridge No. 191 at Km-307-5-6 including temporary arrangement and petty repairs to bridge No-105 at Km-265-2-3. |