View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Amendment in Notice and qualification criteria |
| Field Name | Old Value | New Value |
|---|---|---|
| Document last selling date & time | 02/05/2019 16:00 | 08/05/2019 16:00 |
| Eligibility of Consultant | As Per described in TDS |
As Per described in TDS |
| Opening Date & Time | 05/05/2019 11:15 | 09/05/2019 11:15 |
| PCC--A. General-- |
The Site is located at Monohorganj Upazila and is defined in drawings No: |
The Site is located at Aganagar GPS, Vateshwar GPS, Bagabaria GPS, Middle Lakhipur GPS, Zagadashar GPS etc. at Barura Upazila and Ghaniarchar GPS, Mirash Nilakhi GPS, Kalakandi GPS, Monipur (1) GPS, 15 No Mathavanga, Kriparampur GPS, Bagmara gps etc. at Homna Upazila is defined in drawings No:
The Respective bidders are humbly requested to visit the site properly before Participation in bidding Process. |
| PCC--A. General-- |
The Works consist of Construction of 10 Nos Two Storied RCC Wash Block (MT+Boys and FT+Girls) including 2 Nos Inspectin Pit 1 No Soak Well & 1 No Septic Tank with all Sanitary & Electrical Works, Running water Supply etc. at Monohorganj Upazila of Cumilla District under Need Based Infrastructure Development of Government Primary School (NBIDGPS-1) |
The Works consist of Construction of 10 Nos Two Storied RCC Wash Block (MT+Boys and FT+Girls) including 20 Nos Inspectin Pit 10 No Soak Well (Bricks Structure) & 10 No Septic Tank with all Sanitary & Electrical Works, Running water Supply etc. at Barura and Homna Upazila of Cumilla District under Need Based Infrastructure Development of Government Primary School (NBIDGPS-1) |
| PCC--D. Cost Control-- | The proportion of payments to be retained is 10 percent. |
The proportion of payments to be retained is 10 percent. |
| PCC--D. Cost Control-- | The amount of Liquidated Damages or in other words Delay Damages is 0.05 percent of final Contract price of the uncompleted Works or any part there of itâ??s per day of delay. |
The amount of Liquidated Damages or in other words Delay Damages is 0.05 percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay. |
| Last date & time for Tender/Proposal Security Submission | 02/05/2019 17:00 | 08/05/2019 17:00 |
| Closing Date & Time | 05/05/2019 11:15 | 09/05/2019 11:15 |
| TDS/PDS--C. Qualification Criteria-- | The required average annual construction turnover (AACT) shall be greater than 17000000/- (Taka One Crore Seventy Lacs only) over the last 05 years. Turn over certificate must be at per Experience certificate mentioned above or at per payment certificate. Duplication will not be allowed. Turn over must be construction turn over. AACT shall be Counted from Years backward from the date of advertisement in e-GP Website.(18-04-19 to 17-04-14) |
The required average annual construction turnover (AACT) shall be greater than 15000000/- (Taka One Crore Fifty Lacs only) over the last 05 years. Turn over certificate must be at per Experience certificate mentioned above or at per payment certificate. Duplication will not be allowed. Turn over must be construction turn over. AACT shall be Counted from Years backward from the date of advertisement in e-GP Website.(18-04-19 to 17-04-14) |
| TDS/PDS--D. Tender Preparation-- | Tenderer shall submit with its Tender, the following additional documents: The bidder should be filled up the Tender Capacity form with Works IN Hand with documentary evidence.
1) Valid Upto Date Trade Licence 5) Written confirmation authorizing the signatory of the Tenderer including National ID 6) Litigation History (If Any) 7) Required Manpower of Graduate and Diploma Engineer 8) Required Equipment of Steel Shutter with Mixer Machine, Vibrator, Steel Props etc. |
Tenderer shall submit with its Tender, the following additional documents: The bidder should be filled up the Tender Capacity form with Works IN Hand with documentary evidence.
1) Valid Upto Date Trade Licence 5) Written confirmation authorizing the signatory of the Tenderer including National ID 6) Litigation History (If Any) 7) Required Manpower of Project Manager (B.Sc In Civil Engineering) and Project Engineer (Diplomain Civil Engineering) and Work Supervisor ( H.S.C or Equivalent) 8) Mandatory Required Equipment of Steel Props with Steel Shutter, Mixer Machine, Vibrator, Safety Equipments etc. |
| TDS/PDS--E. e-Tender Submission-- | The deadline for lodgment of e-Tenders is at 11:15 A.M 05th May, 2019 |
The deadline for lodgment of e-Tenders is at 11:15 A.M 09th May, 2019 |
| Brief Description of Goods,Works or Service | Construction of 10 Nos Two Storied RCC Wash Block (MT+Boys and FT+Girls) including 2 Nos Inspectin Pit 1 No Soak Well & 1 No Septic Tank with all Sanitary & Electrical Works, Running water Supply etc. at Barura and Homna Upazila of Cumilla District under Need Based Infrastructure Development of Government Primary School (NBIDGPS-1) |
Construction of 10 Nos Two Storied RCC Wash Block (MT+Boys and FT+Girls) including 2 Nos Inspectin Pit 1 No Soak Well & 1 No Septic Tank with all Sanitary & Electrical Works, Running water Supply etc. at Barura and Homna Upazila of Cumilla District under Need Based Infrastructure Development of Government Primary School (NBIDGPS-1) |