01. The minimum number of general experience of the Tenderer in the Electrical construction works shall be 05 (Five) years. 02. A satisfacroty completion of Installation of a 33/11kV 20/28 MVA transformer or higher capacity or same nature of works under Govt/Semi Govt/Autonomous organization maximum two nos of Contracts amounting in total not less than taka 700,000/-(Seven lac) only as a Prime Contractor over a period of last 03 (Three) years shall be required. Work order and satisfactory completion certificate shall have to be enclosed
03. The requried average annual construction turnover shall be greater than taka 750000/- (Seven lac fifty Thousand) only over the last 03 (three) years. 04. The minimum amount of liquid assets of working capital or credit facilities of the Tenderer shall be taka 7.00 Lac (SevenLac) only which shall be supported by bank statement and the statement will not before tender publication date in the e-GP portal. Tenderer those who will submit credit facilities from the bank, they should submit letter of Commitment for Banks. Undertaking for Line of Credit (Form PW3-7) 05. The Tenderer shall have legal capacity to enter into the Contract. 06. Years counting backward from the date of publication of IFT in the e-GP. 07. Joint venture will not be allowed for this Tender & Quoted price shall not be above 10% or below 10% on estimated price. 08. All other Terms & Condition are available in the Tender document.
Installation of One 20/28 MVA Transformer by Replacing of One 10/14 MVA Transformer at Mogbazar 132/33/11 kV Grid Substation Under Grid North-2 DPDC