i) As Per Tender Document. ii) The Tenderer whose total quoted amount above/below the 10% (Ten percent) of official estimated cost shall be considered as rejected.
Fitting of floor tiles with other renovation works of 2-class rooms renovation of general bathroom block at 1st floor and fitting of false ceiling at 1st floor corridor/lobbi of administrative building of CTC Khulshi Ctg.