View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Change Propotion of Retaintion Money |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | a) The minimum number of years of general experience of the Tendered in the construction works as Prime Contractor shall be 5(Five) years; years counting backward from the date of publication of IFT. b) The minimum specific experience as a Prime Contractor in Construction works of at Least (1) One contract(s) of similar nature of Building Construction Works from Government/Semi-Government/Autonomous Organization of Bangladesh successfully completed within the last (05) Five years in a single work order of minimum value at least Tk.380.00 lakh. (work order & completion certificate must be submitted) c) The required average annual construction turnover shall be greater than Tk.315.00 Lakh within the last (05) Five years counting backward from the date of publication of IFT. (Financial year wise separately turnover should be submitted) d) The minimum amount of Liquid Assets i.e working capital or credit facilities of the tenderer shall be BDT. 80.00 Lakh only. In case of bank statement submitted by the tenderer, the tenderer shall instruct to the concerned bank authority to supply latest balance & statement as required by the Procuring Entity (PE) even at the period of evaluation. e) Tender security of Tk.14,50,000.00 submitted through bank draft, pay order or bankguarantee from any schedule bank of Bangladesh. f) The tenderer must have up to date valid trade license, VAT-Registration certificate, TIN-Certificate and NID. g) Any alteration, modification or cancellation of e-tender, no extra claim will be entitled. h) According to Letter No-03.074.039.16.00.004.2018-377 dt : 30/08/2018 from Office of The Prime Minister; The contractor who has not completed his/her work/works within schedule stipulated time by ensuring the quality without any acceptable reason, will not to be considered as a qualified tenderer for this tender notice. |
a) The minimum number of years of general experience of the Tendered in the construction works as Prime Contractor shall be 5(Five) years; years counting backward from the date of publication of IFT. b) The minimum specific experience as a Prime Contractor in Construction works of at Least (1) One contract(s) of similar nature of Building Construction Works from Government/Semi-Government/Autonomous Organization of Bangladesh successfully completed within the last (05) Five years in a single work order of minimum value at least Tk.380.00 lakh. (work order & completion certificate must be submitted) c) The required average annual construction turnover shall be greater than Tk.315.00 Lakh within the last (05) Five years counting backward from the date of publication of IFT. (Financial year wise separately turnover should be submitted) d) The minimum amount of Liquid Assets i.e working capital or credit facilities of the tenderer shall be BDT. 80.00 Lakh only. In case of bank statement submitted by the tenderer, the tenderer shall instruct to the concerned bank authority to supply latest balance & statement as required by the Procuring Entity (PE) even at the period of evaluation. e) Tender security of Tk.14,50,000.00 submitted through bank draft, pay order or bankguarantee from any schedule bank of Bangladesh. f) The tenderer must have up to date valid trade license, VAT-Registration certificate, TIN-Certificate and NID. g) Any alteration, modification or cancellation of e-tender, no extra claim will be entitled.
h) According to Letter No-03.074.039.16.00.004.2018-377 dt : 30/08/2018 from Office of The Prime Minister; The contractor who has not completed his/her work/works within schedule stipulated time by ensuring the quality without any acceptable reason, will not to be considered as a qualified tenderer for this tender notice. |
| PCC--D. Cost Control-- | The proportion of payments to be retained is 0% (Zero) percent. |
The proportion of payments to be retained is 0% (Zero) percent. But after completion of work 5% of contract amount will be given as form of bank guarantee or pay order which will be retained up to defects liability period. |
| Brief Description of Goods,Works or Service | Construction of 6 Storied Academic Building With 6 Storied Foundation in/c. Sanitary Water Supply & Internal Electrification Works at Boalmari Govt. Girls High School Under Boalmari Upazila Faridpur District. |
Construction of 6 Storied Academic Building With 6 Storied Foundation in/c. Sanitary Water Supply & Internal Electrification Works at Boalmari Govt. Girls High School Under Boalmari Upazila Faridpur District. |