1)The minimum number of years of general experience of the Tenderer in the construction works as Prime Contractor or Subcontractor or Management Contractor shall be 5(five) years
2)The minimum specific experience as a Prime Contractor or Subcontractor or Management Contractor in construction works of at least 1(one) number contract of 3- storied building with 3-storied pile foundation successfully completed within the last 5(five) years with a value of at least Tk. 700.00 (seven hundred) lac. Years counting backward from the date of publication of tender in the e-GP portal.
3)The required average annual construction turnover shall be greater than Tk 900.00 (nine hundred) lac over the last 5 (five) years or best 5(five) years in the last 10(ten) years. Years counting backward from the date of publication of tender in the e-GP portal.
4)The minimum amount of liquid assets i.e working capital or credit line(s) of the Tenderers shall be Tk 225.00 (two hundred twenty five) lac. Liquid assets i.e working capital or credit line(s) must be issued by bank in between from the date of publication of tender and submission of tender in the e-GP portal.
5)The minimum tender capacity shall be 75% of the official estimated cost. To calculate minimum tender capacity the tenderer must be submitted value of existing commitments and works to be completed during the next completion time of the proposed work by concern PE. Otherwise the tender will not be considered for evaluation.
6) Tenderers having quoted the tender price more than 10 (Ten) percent above or below the official cost estimate, the tender will be rejected.
7)Up to date ABC and Supervisory Licence.
8) Up to date Trade licence (2018-2019)
9) Up to date Income TAX licence (2018-2019)
10) Valid VAT registration certificate.
|