View IFT /PQ / REOI / RFP / PPS Notice Details
Ministry : Ministry of Local Government, Rural Development and Co-operatives Division : Local Government Division
Organization : Department of Public Health Engineering (DPHE) Procuring Entity Name : Office of the Executive Engineer,DPHE,Netrokona
Procuring Entity Code : Procuring Entity District : Netrokona
Procurement Nature : Works Procurement Type : NCT
Event Type : Invitation for : Tender - Single Lot
Invitation Reference No. : 46.03.7200.061.07.071.19-162 Date 31/7/2019 Tender/Proposal Status :
App ID : 156102 Tender/Proposal ID : 347028
Key Information and Funding Information :
Procurement Method : Open Tendering Method (OTM) Budget Type : Development
Source of Funds : Government
Particular Information :
Project Code : 5-2431-5004 Project Name : Need Based Infrastructure Development of Government Primary Schools Project (1 st phase) (NBIDGPS-1)
Tender/Proposal Package No. and Description : WB-GPS-255
Construction of 5 Nos RCC WASH BLOCK FT Boys & MTGirls including 2 Nos Inspection Pits 1 Nos Soak Well & 1 Nos Septic Tank with all Sanitary and Electrical Works under Need Based Infrastructure Development of Government Primary Schools Project 1 st phase NBIDGPS-1 at specified Primary Schools of Purbadhala Upozilla during the FY 2019-2020
Category : Site preparation work; Construction work; Works for complete or part construction and civil engineering work; Building installation work; Construction work; Building completion work;Building demolition and wrecking work and earthmoving work;Test drilling and boring work;Building construction work;Engineering works and construction works;Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork;Construction work for water projects;Construction works for plants, mining and manufacturing and for buildings relating to the oil and gas industry;Roof works and other special trade construction works;Electrical installation work;Insulation work;Plumbing and sanitary works;Fencing, railing and safety equipment installation work;Mechanical installations;Plastering work;Joinery and carpentry installation work;Floor and wall covering work;Painting and glazing work;Other building completion work
Scheduled Tender/Proposal Publication
Date and Time :
31-Jul-2019 12:45 Tender/Proposal Document last selling /
downloading Date and Time :
18-Aug-2019 17:30
Pre - Tender/Proposal meeting Start
Date and Time :
31-Jul-2019 17:39 Pre - Tender/Proposal meeting End
Date and Time :
08-Aug-2019 17:39
Tender/Proposal Closing
Date and Time :
19-Aug-2019 12:39 Tender/Proposal Opening
Date and Time :
19-Aug-2019 12:39
Last Date and Time for Tender/Proposal Security
Submission :
19-Aug-2019 11:39    
Information for Tenderer/Consultant :
Eligibility of Tenderer :

As per ITT, TDS,  PCC,  GCC, PPA, PPR and all of its Amendment

Upozilla - Purbadhala

Brief Description of Works :

Construction of 5 Nos RCC WASH BLOCK FT Boys & MTGirls including 2 Nos Inspection Pits 1 Nos Soak Well & 1 Nos Septic Tank with all Sanitary and Electrical Works under Need Based Infrastructure Development of Government Primary Schools Project 1 st phase NBIDGPS-1 at specified Primary Schools of Purbadhala Upozilla during the FY 2019-2020

Evaluation Type : Lot wise
Document Available : Package wise
Document Fees : Package wise
Tender/Proposal Document Price (In BDT) : 1000
Mode of Payment :
Tender/Proposal Security Valid Up to : 14-Jan-2020
Tender/Proposal Valid Up to : 17-Dec-2019
Lot No. Identification of Lot Location Tender/Proposal security
(Amount in BDT)
Tentative Start Date Tentative Completion Date
1 Construction of 5 Nos RCC WASH BLOCKFT Boys & MTGirls including 2 Nos Inspection pits 1 Nos Soak Well & 1 Nos Septic tank with all Sanitary and Electrical Works under Need Based Infrastructure Development of Government Primary Schools Project 1 st phase NBIDGPS-1 at specified Primary Schools of Kalmakanda Upozilla Purbadhala 120000 01-Sep-2019 01-Mar-2020
Procuring Entity Details:
Name of Official Inviting Tender/Proposal : EE Netrokona Designation of Official Inviting Tender/Proposal : Executive Engineer
Address of Official Inviting Tender/Proposal :
Address: Office of the Executive Engineer,DPHE,Netrokona
City: Netrokona
Thana: Netrokona
District: Netrokona - 2400
Country: Bangladesh
Contact details of Official Inviting Tender/Proposal :
Phone No: 09-5161397
Fax No:
The procuring entity reserves the right to accept or reject all Tenders/Proposals / Pre-Qualifications / EOIs
Note: Bank will update the payment transactions only at the end of the day, so the tenderers should make sure the securities and other payments are made at least one day before the submission date.
Documents
Amendment / Corrigendum Detail
 Amendment / Corrigendum No. :  1 
Amendment / Corrigendum Text :

Amendment/ Corrigendum 1

Field Name Old Value New Value
Eligibility of Consultant

As per ITT, TDS,  PCC,  GCC, PPA, PPR and all of its Amendment

Upozilla - Purbadhala

As per ITT, TDS,  PCC,  GCC, PPA, PPR and all of its Amendment

Upozilla - Purbadhala

PCC--C. Quality Control--

The Defects Liability Period is [state months]
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

The Defects Liability Period is twelve (12) months
[usually Defect Liability Period is twelve (12) months to cover at least one complete monsoon season].
 

PCC--D. Cost Control--

The following additional events shall also be the Compensation Events:
[list events or state none ]
 

6. The following additional events shall also be the Compensation Events:
1. If all the sites are not available to contractor from respective authority in due time this extra time will be treated as compensation event and completion time of the
work will be extended accordingly.
 

PCC--D. Cost Control--

The proportion of payments to be retained is [insert percent] percent.

The proportion of payments to be retained is 10 percent.

PCC--D. Cost Control--

The amount of Liquidated Damages or in other words Delay Damages is [insert percentage] percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

The amount of Liquidated Damages or in other words Delay Damages is 01 percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay.
[usually the percent-rate of liquidated damages is set at between 0.05 and 0.10 of ONE (1) percent of final Contract price of the uncompleted Works or any part there of it’s per day of delay]
Guide to application of GCC Sub Clause 28.1 above
[ Liquidated damages is equivalent to an amount to be determined in accordance with the following formula
T LD = VUW x P x n
Where;
T LD = Total amount of Liquidated Damages
VUW = Value of Uncompleted Works (i.e. works not having been completed as of the expiry of the Intended Completion Date plus the works completed after the expiry of the Intended Completion Date). VUW shall be calculated by deducting the value of the completed works under the Contract from the total Contract price.
P = Percent-rate at which the Liquidated Damages shall be imposed for every day of delay of the final Contract price of the uncompleted Works or any part there of.
n = No of days of delay for completion of works under the Contract]
 

PCC--D. Cost Control--

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is [insert percentage] percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
 

The maximum amount of Liquidated Damages for the uncompleted Works or any part thereof is 10 percent of the final Contract price of the whole of the Works.
[ usually the total amount of liquidated damages shall not exceed ten (10) percent of the final Contract price for the whole of the Works]
 

PCC--F. Termination--

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is [state percentage] percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

The percentage to apply to the contract value of the works not completed, representing the Procuring Entity’s additional cost for completing the uncompleted Works, is 10 percent.

[ usually between ten (10) to twenty (20) percent depending on the nature of the Works]
 

TDS/PDS--C. Qualification Criteria--

The required average annual construction turnover shall be greater than Tk [insert amount] over the last [state number] years.

[ the required average annual construction  turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be  best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)]
Example:
Estimated Contract Value:  Tk 24 lakh
Contract period:   12 months
Estimated Annual Cash Flow:  Tk 24 lakh
Required average annual construction turn over: Tk 12 lakh, using a multiplier of 0.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The required average annual construction turnover shall be greater than Tk 20.00 lac over the best three (3) years in the last five (5) years

[ the required average annual construction  turn over is recommended to be about less than or equal to the estimated annual cash flow for the Contract; however the multiplier may vary from 0.30 to 1.00 ; [ years counting backward from the date of publication of IFT in the newspaper. The period may be  best three (3) years in the last five (5) years or best five (5) years in the last ten (10) years (as appropriate)]
Example:
Estimated Contract Value:  Tk 24 lakh
Contract period:   12 months
Estimated Annual Cash Flow:  Tk 24 lakh
Required average annual construction turn over: Tk 12 lakh, using a multiplier of 0.5.
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

TDS/PDS--C. Qualification Criteria--

The minimum amount of liquid assets or working capital or credit facilities of the  Tenderer shall be Tk [state amount]

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:
Contract Value:   Tk 24 lakh
Contract period:   12 months
Assuming work time:  1 month
Invoice period:    0.5 month
Certification Time:   0.5 month
Contingency Time:   1 month

Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

The minimum amount of liquid assets or working capital or credit facilities of the Tenderer shall be Tk 20.00 lac

[usually the required liquid asset is the equivalent of 2-6 months payment flow at the average construction rate (straight line distribution), accessible or available after taking into account the financial requirements of existing commitments. The actual period will depend on the speed with which the PE will pay the Contractor’s monthly certificate, allowing time to prepare an invoice, for the Project Manager’s time to certify it, and at least one month contingency for preparing the cheque and making actual payment.
Example:
Contract Value:   Tk 24 lakh
Contract period:   12 months
Assuming work time:  1 month
Invoice period:    0.5 month
Certification Time:   0.5 month
Contingency Time:   1 month

Therefore, the minimum required liquid asset will be Tk. 6 lakh, i.e. 3 months cash flow based on the above assumptions.]
[for Tenders where the package contains more than one (1) lot, this qualification requirements shall be mentioned separately for each lot in the package]
 

TDS/PDS--C. Qualification Criteria--

A satisfactory completion of similar works of at least Tk [insert amount] under [state number] of contract(s) over a period of [state number] years shall be required.

[the minimum value of the similar works under a single or multiple number of  contract(s) is recommended to be between 50  and 75 percent of the estimated cost, rounded off to nearest Taka  thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper]

[for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package]
 

A satisfactory completion of similar works of at least Tk 20 .00 lac under 01 no of contract(s) over a period of last 05 years shall be required.
[the minimum value of the similar works under a single or multiple number of contract(s) is recommended to be between 50 and 75 percent of the estimated cost, rounded off to
nearest Taka thousand, of the proposed work. years counting backward from the date of publication of IFT in the newspaper]
[for Tenders where the package contains more than one (1) lot, this qualification requirements, shall be mentioned separately for each lot in the package]

Brief Description of Goods,Works or Service

Construction of 5 Nos RCC WASH BLOCK FT Boys & MTGirls including 2 Nos Inspection Pits 1 Nos Soak Well & 1 Nos Septic Tank with all Sanitary and Electrical Works under Need Based Infrastructure Development of Government Primary Schools Project 1 st phase NBIDGPS-1 at specified Primary Schools of Purbadhala Upozilla during the FY 2019-2020

Construction of 5 Nos RCC WASH BLOCK FT Boys & MTGirls including 2 Nos Inspection Pits 1 Nos Soak Well & 1 Nos Septic Tank with all Sanitary and Electrical Works under Need Based Infrastructure Development of Government Primary Schools Project 1 st phase NBIDGPS-1 at specified Primary Schools of Purbadhala Upozilla during the FY 2019-2020

 