View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 2
|
|
| Amendment / Corrigendum Text : | The following Amendment/ Corrigendum made for the Tender. All other will remain same. All the Amendment/ Corrigendum (s) are the part & parcel of the Tender and will be part of contract agreement.
|
| Amendment / Corrigendum/ Addendum No. : | 2 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Technical Specification (Dredging).zip | Technical Specification of Dredging | 2655274 | ||
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | The following Amendment/ Corrigendum made for the Tender. All other will remain same. The Amendment/ Corrigendum are the part & parcel of the Tender and will be part of contract agreement
.
|
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. Tenderer must be registered on e-GP Portal with a valid trade license, TIN Certificate. 2. Tenderer must submit similar nature work certificate,annual construction turnover certificate and liquid assets certificate. 3. Payment will be made after availability of fund. 4. Any individual Tender/Bangladeshi Tenderer(s)/firm(s) who fulfill the qualification(s) criteria stipulated in the Tender Document PPA-2006 and PPR-2008. 5. Tenderer must submit line of credit certificate in PW3-7 prescribed format which is to be uploaded in section 8. 6. The tender must comply with the instructions/office orders/circulars issued by BWDB in connection with dredging work. 7. All the information,clarification and documents submitted by the tenderer must comply with declaration given. 8. Tenderer shall own or have proven access to hire or lease of the major construction equpments, in full working order (required documents must be submitted). 9. The alignment of dredging may be shifted and volume of work may be changed as per field condition(Direction and Volume of river flow, Development of land along the river etc.) before on during implementation of work. |
1. Tenderer must be registered on e-GP Portal with a valid trade license, TIN Certificate. 2. Tenderer must submit similar nature work certificate,annual construction turnover certificate and liquid assets certificate. 3. Payment will be made after availability of fund. 4. Any individual Tender/Bangladeshi Tenderer(s)/firm(s) who fulfill the qualification(s) criteria stipulated in the Tender Document PPA-2006 and PPR-2008. 5. Tenderer must submit line of credit certificate in PW3-7 prescribed format which is to be uploaded in section 8. 6. The tender must comply with the instructions/office orders/circulars issued by BWDB in connection with dredging work. 7. All the information,clarification and documents submitted by the tenderer must comply with declaration given. 8. Tenderer shall own or have proven access to hire or lease of the major construction equpments, in full working order (required documents must be submitted). 9. The alignment of dredging may be shifted and volume of work may be changed as per field condition(Direction and Volume of river flow, Development of land along the river etc.) before on during implementation of work. |
| Brief Description of Goods,Works or Service | Dredging of Char in Arial Khan River from KM 0.000 to KM 1.500 =1500.00m at Chandrapara Pak Darbar Sharif in C/W Bank Protective Work & Dredging in Arial Khan River in Faridpur District under Faridpur O&M Division BWDB Faridpur during the year 2019-20 & 2020-21. Package no:AK-03/DREG/CPPDS |
Dredging of Char in Arial Khan River from KM 0.000 to KM 1.500 =1500.00m at Chandrapara Pak Darbar Sharif in C/W Bank Protective Work & Dredging in Arial Khan River in Faridpur District under Faridpur O&M Division BWDB Faridpur during the year 2019-20 & 2020-21. Package no:AK-03/DREG/CPPDS |
| Amendment / Corrigendum/ Addendum No. : | 1 | ||||
| S. No. | File Name | File Description | File Size (in KB) |
||
|---|---|---|---|---|---|
| 1 | Circular (MoWR).pdf | Circular | 1976770 | ||