1. All tenderer as per ePW3 & registered in egp portal system are eligible.
2. Itemwise cost Breakdown in BWDB Template(attached herewith in section 8: Particular Specification) should be submitted with the e-tender(Analysis Template of Rate Analysis may also available in BWDB Web site archives/go through this link- http://http://bwdb.gov.bd/index.php?option=com_content&view=article&id=477%3Aschedule-of-rates&catid=1%3Aevent&Itemid=173).
3. Letter of Commitment for Bank's undertaking for Line of Credit should be submitted in prescribed format (Form PW3-7) as per ITT Clause 32.1(d) See section8: Particular Specification.
4. Confirming the circular about Formation of JVCA, Business Share, Specific Experience, Turnover (See attached document of CPTU Circular in section 8: Particular Specification.
eTender_WG_UzARTKhal_Rex_18/2015-16
Re-excavation of (a) Uzani Khal from km. 0.000 to km. 1.650 =1.650km; (b) Asner kila Khal from km. 0.000 to km. 1.000 = 1.000km; (c) Ratail Khal from km. 0.000 to km. 2.850 = 2.850km. (d) Tetulia Khal from km. 0.000 to km. 4.200 = 4.200km. Grand Total (a+b+c+d)= 9.700km. in Connection with West Gopalganj Integrated Water Management Project Under Gopalganj O&M Division, BWDB, Gopalganj During the year 2015-16.