01.The minimum number of general experience of the Tenderer in the civil construction works shall be 05(Five) years. 02. A satisfacroty completion substation related Works or same nature of works under Govt/Semi Govt/Autonomous Organization amounting not less than Taka 650000.00(Six Lac Fifty Thousand) only as a Prime Contractor under single contract/ Work Order over a period of last 05 (Five) years shall be required. Work order and satisfactory completion certificate shall have to be enclosed. 03. The requried average annual construction turnover shall be greater than Taka 10.00 (Ten) Lac only over the last 05 (Five) years. 04. The minimum amount of liquid assets of working capital or credit facilities of the Tenderer shall beTaka 700000.00(Seven Lac) only which shall be supported by bank statement and the statement will not before tender publication date in the e-GP portal. Tenderer those who will submit credit facilities from the bank, they should submit letter of Commitment for Banks. Undertaking for Line of Credit (Form PW3-7) 05. The Tenderer shall have an experience of Electrical work in KPI Installation yard. 06. The Tenderer shall have legal capacity to enter into the Contract. 07. Years counting backward from the date of publication of IFT in the e-GP. 08. Joint venture will not be allowed for this Tender & quoted price shall not be above 10% or below 10% on estimeted price. 09. All other Terms & Condition are available in the Tender document.
Shifting of 11 kV switch gears from ground floor old building to ground floor of new GIS building and Installation of 2 RTCC in 1st floor of new GIS building in Ullon Substation under Grid Noth-2 DPDC