1. A satisfactorily completion of similar works of at least TK. 12,00,000.00 ( Twelve Lac ) only under 02 (Two) number of contract(s) each over a period of 03 (Thee) years shall be required.
2. The required average annual construction turnover shall be greater than TK. 14,00,000.00 (Forteen Lac) only over the last 03 (Three) years.
3. The minimum amount of liquid assets or working capital or credit facilities of the tenderer shall be TK. 16,00,000.00 (Sixteen Lac) only.
4. The minimum capital shall be 14,00,000.00 (Forteen Lac) only.
Vertical extension, renovation & repairing of Surrounding boundary wall & drain with painting at Head Office, Chattogram