View IFT /PQ / REOI / RFP / PPS Notice Details
Amendment / Corrigendum Detail
|
Amendment / Corrigendum No. : 1
|
| Amendment / Corrigendum Text : |
ok |
| Field Name |
Old Value |
New Value |
| Eligibility of Consultant
|
The Tenderer qualification criteria as follow (details see in the TDS):
(a) Similar works of at least Tk. 9.00 lac under a single contract over the last 5(five) years.
(b) Average annual construction Turnover of Tk. 14.00 lac over the last 5(five) years.
(c) Liquid assets or Credit facilities of the Tenderer shall be Tk. 10.00 Lac.
Note: Please read the instructions carefully before submitting your tender.
1. Documents regarding annual construction turnover must be submitted in the form of year-wise Payment Certificate from the respective PE Or Construction Turnover form the Income Tax Office.
2. Liquid assets shall remain until Contract Award. In case of credit facilities; the evidence must be mentioned the Tender ID & Name of works (Form-e-PW2a),
3. If the quoted rate of any item deviates more than 10% (Ten percent) compared to the rate of that item in the RHD rate schedule 2015, then the tenderer must submit the rate analysis for that item in the RHD Rate Analysis Format.
|
The Tenderer qualification criteria as follow (details see in the TDS):
(a) Similar works of at least Tk. 6.50 lac under a single contract over the last 5(five) years.
(b) Average annual construction Turnover of Tk. 10.00 lac over the last 5(five) years.
(c) Liquid assets or Credit facilities of the Tenderer shall be Tk. 9.00 Lac.
Note: Please read the instructions carefully before submitting your tender.
1. Documents regarding annual construction turnover must be submitted in the form of year-wise Payment Certificate from the respective PE Or Construction Turnover form the Income Tax Office.
2. Liquid assets shall remain until Contract Award. In case of credit facilities; the evidence must be mentioned the Tender ID & Name of works (Form-e-PW2a),
3. If the quoted rate of any item deviates more than 10% (Ten percent) compared to the rate of that item in the RHD rate schedule 2015, then the tenderer must submit the rate analysis for that item in the RHD Rate Analysis Format.
|