1. A satisfactory completion of similar works of at least Tk 7.00[Seven] lakh under 01(one) of contract over a period of last 5(five) years shall be required.(not before FY::2010-11 )
2.The required average annual construction turnover shall be greater than Tk 6.00(Six) lakh over the last 05(five) years.(not before FY::2010-11 )..
3.The minimum amount of liquid assets i.e banking instrument or woking capital or credit facilities or credit line of the Tenderer shall be Tk,.4.00( Four ) lakh only
4..If any tenderer qualify more than one contract, cumulative financial criteria will be apply to select lowest tenderer.
5. In case of multiple number of contractual commitsments, a written testimony by the tenderer that demonstrates that the tenderer have resources sufficient to meet the aggregate of the qualifying criteria for the individiual contracts/ contractual commitments.
6.The contractor have to submit the format ( sample copy attached in particular Specifications) about his current liquid asset & contract in hand.
IRIDP- 2/SRT/DW-23 Construction of 1x4.00mx4.00m RCC Box culvert on Lakarta Ice Factory to Digombar road at ch. 700.00m under Bhedargonj upazila, District:Shariatpur.(Road ID No. 386145030)