View IFT /PQ / REOI / RFP / PPS Notice Details
|
Amendment / Corrigendum No. : 1
|
|
| Amendment / Corrigendum Text : | Corrigendum |
| Field Name | Old Value | New Value |
|---|---|---|
| Eligibility of Consultant | 1. Tenderer must has to be registered on e-GP Portal with a valid trade license, TIN certificate. 2. Tenderer only from Bangladesh can participate to the tender. 3. Tenderer must need to submit similar nature work certificate, annual construction turnover certificate and liquid assets certificate. 4. Payment will be made after availability of fund. 5. Any individual Tender (s)/firm (s) who fulfill the qualification (s) criteria stipulated in the Standard Tender Document including Tender data sheet and PPR-2008. 6.Tenderer must need to be submitted line of credit certificate in PW3-7 prescribed format which is attached n the general section of this tender. 7. Work certificate which is issued by the PE (Procuring Entity) only is considered for turnover calculation. Other work certificates are not being considered. 8. Tender evaluation will be conducted by the basis of uploaded documents of tenderer. Outside or offline documents will not being considered 9. Contractor must need to take still pictures and video before starting the work and after completion of work byhis/ her own cost. These still pictures and videos need to enclose with the bill of work. |
1. Tenderer must has to be registered on e-GP Portal with a valid trade license, TIN certificate. 2. Tenderer only from Bangladesh can participate to the tender. 3. Tenderer must need to submit similar nature work certificate, annual construction turnover certificate and liquid assets certificate. 4. Payment will be made after availability of fund. 5. Any individual Tender (s)/firm (s) who fulfill the qualification (s) criteria stipulated in the Standard Tender Document including Tender data sheet and PPR-2008. 6.Tenderer must need to be submitted line of credit certificate in PW3-7 prescribed format which is attached n the general section of this tender. 7. Work certificate which is issued by the PE (Procuring Entity) only is considered for turnover calculation. Other work certificates are not being considered. 8. Tender evaluation will be conducted by the basis of uploaded documents of tenderer. Outside or offline documents will not being considered 9. Contractor must need to take still pictures and video before starting the work and after completion of work byhis/ her own cost. These still pictures and videos need to enclose with the bill of work. |
| Brief Description of Goods,Works or Service | Bank Revetment Work on Brahmaputra River Left Bank from KM 13.050 to KM 13.100 50.00m with U/S End-termination at Ghumari Area in Union Bandober Upazil Rowmari District-Kurigram during 2019-2020 & 2020-2021 |
Bank Revetment Work on Brahmaputra River Left Bank from KM 13.050 to KM 13.100 50.00m with U/S End-termination at Ghumari Area in Union Bandober Upazil Rowmari District-Kurigram during 2019-2020 & 2020-2021 |