As Per TDS
EMCRP/W13 (1) Improvement of R&H Hindu Rohingya New Camp New Hindu para Rohingya Camp Road from Ch.00-520m by HBB and 4 nos. cross drain size 750mm750mm 2 nos. Box culvert size 2m1.5m & 1 no size 3m2m ch. 245m 635m & 420m. Total length 0.520km, [Salvage Cost : 1,36,564.00] ( 2) Improvement of Shafiullah ghata Rohingya Camp road from Ch.00-560m by HBB and 4 nos. Cross drain size 750mm750mm 2 nos. Box culvert size 2m1.5m at ch. 415m & 435m. Total length 0.560km (3) Improvement Thainkhali Gonarpara to Tajnimarkhola Road to Tajnimarkhola Camp Different Camps from Ch.00-2775m by BC and 17 nos. Cross drain 750mm750mm 4 nos. Box culvert size 13m2.5m 22.5m2m 12m1.5m & 12m1.5m at ch. 515 1995 2500m & 2763m Road ID- 422945093. Total length 2.275km,[Salvage Cost : 28,85,459.00] (4) Improvement of Union Parishad Chorahlola Road to Hakimpara Camp from Ch.00-2205m by BC and 7 nos. Cross drain size 750mm750mm 6 nos. Box culvert 2 nos. 2m1.5m 1 no. 2.5m2.5m 3 nos. 3.5m3.5m at ch. 1327m 1583m 1828m 1875m 1975m Road ID- 422945096. Total length 2.205km,[Salvage Cost : 4,48,506.00] (5) Improvement of Thinkhali Boddhogona road to Tanjimarkhola Camp by BC from Ch. 00-640m and 4 nos. Cross drain size 750mm750mm 3 nos. Box culvert 2 nos. 2m1.5m & 1 no 3m2.5m at Ch. 245m 635m & 420m Road ID- 422945094. Total length 0.640km, [Salvage Cost : 89,073.00] (6) Improvement of R&H at TV Tower road to Camp-7 connecting road from Ch.00-3300m in Rohingya Camp-7 and Link road TV tower road from ch. 00-1450m to D-5 from Ch. 00-800m by HBB and 6 nos. Cross drain size 750mm750mm. Total length 1.450km,[Salvage Cost : 23,76,338.00] under Ukhiya upazila Dist Coxs Bazar.